  1. IMPLEMENTATION

  2. 1.-Identify patient using two identifiers according to agency policy.

  3. 2.-Position patient in semireclining or supine during assessment and pouching

  4. 3.-Perform hand hygiene and apply clean gloves

  5. 4.-Place towel or disposable waterproof barrier under patient and across patient’s lower abdomen.

  6. 5.-If not done during assessment, remove used pouch and skin barrier gently by pushing skin away from barrier.

  7. 6.-Clean peristomal skin gently with warm tap water using washcloth; do not scrub skin.

  8. 7.-Measure stoma. Expect size of stoma to change for first 4 to 6 weeks after surgery.

  9. 8.-Trace pattern of stoma measurement on pouch backing or skin barrier.

  10. 9.-Cut opening on backing or skin barrier wafer. Be sure that opening is at least 1 8 larger than stoma to avoid pressure on it

  11. 10.-Remove protective backing from adhesive.

  12. 11.-Apply pouch over stoma. Press firmly into place around stoma and outside edges. Have patient hold hand over pouch to apply heat to secure seal.

  13. 12.-Close end of pouch with clip or integrated closure. Remove drape from patient.

  14. 13.-Remove gloves. Perform hand hygiene

  15. COMPLETE.

Informationen

Beschreibung
Flussdiagramm am Implentation., erstellt von Jesus Blanco Hdez am 27/04/2021.
Erstellt von
Jesus Blanco Hdez
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck