7. PROJECT COST MANAGEMENT

MARILUZ TAYPE ALMONACID Spanisch

Inhalt der Mindmap

7. PROJECT COST MANAGEMENT

  1. 7.1 Plan Cost Management

    • This defining how the project costs will be estimated, budgeted, managed, monitored, and controlled.
    • .1 Inputs
      • .1 Project charter
      • .2 Project management plan
      • .3 Enterprise environmental factors
      • .4 Organizational process assets
    • .2 Tools & Techniques
      • .1 Expert judgment
      • .2 Data analysis
        • Alternatives analysis
          • can include reviewing strategic funding options, consideration of ways to acquire project resources such as making, purchasing, renting, or leasing.
      • .3 Meetings
    • .3 Outputs
      • .1 Cost management plan
        • Describes how the project costs will be planned, structured, and controlled
        • Units of measure
          • such as staff hours, staff days, or weeks for time measures; meters, liters, tons, kilometers, etc for each of the resources.
        • Level of precision
          • (e.g., US$995.59 to US$1,000)
        • Level of accuracy
          • The acceptable range (e.g., ±10%)
        • Organizational procedures links.
          • provides the framework for the cost management plan
        • Control thresholds
          • For monitoring cost performance
        • Rules of performance measurement.
        • Reporting formats.
        • Additional details
  2. 7.2 Estimate Costs

    • This developing an approximation of the monetary resources needed to complete project work.
    • .1 Inputs
      • .1 Project management plan
        • Cost management plan
          • Describes estimating methods that can be used and the level of precision and accuracy required for the cost estimate.
        • Quality management plan
          • Describes the activities and resources necessary for the project management team
        • Scope baseline
          • Includes the project scope statement, WBS, and WBS dictionary:
      • .2 Project documents
        • Lessons learned register
          • To improve the accuracy and precision of the cost estimates.
        • Project schedule
          • Includes the type, quantity, and amount of time that team and physical resources will be active on the project
        • Resources requirements
          • Identify the types and quantities of resources required for each work package or activity.
        • Risk register
          • Provides detailed information that can be used to estimate costs
      • .3 Enterprise environmental factors
        • Include are Market conditions, Published commercial information, Exchange rates and inflation.
      • .4 Organizational process assets
    • .2 Tools & Techniques
      • .1 Expert judgment
      • 2 Analogous estimating
        • Using for estimating the duration or cost of an activity or a project using historical data from a similar activity or project.
        • Is generally less costly and less time-consuming than other techniques, it is also less accurate
      • .3 Parametric estimating
        • Uses a statistical relationship between historical data and other variables
      • .4 Three-point estimating
        • Most likely (tM), Optimistic (tO) and Pessimistic (tP).
      • .5 Bottom-up estimating
        • Is a method of estimating project duration or cost by aggregating the estimates of the lower level components of the WBS.
      • .6 Data analysis
        • Alternatives analysis
          • Used to compare various levels of resource capability or skills; scheduling compression techniques
        • Reserve analysis
          • Contingency reserves are the estimated duration within the schedule baseline, which is allocated for identified risks that are accepted, are associated with the known-unknowns
          • Management reserves are a specified amount of the project budget withheld for management control purposes and are reserved for unforeseen work that is within the scope of the project; also is not included in the schedule baseline.
      • .7 Decision making
      • .8 Meetings
    • .3 Outputs
      • .1 Duration estimates
        • Are quantitative assessments of the likely number of time periods that are required to complete an activity, a phase, or a project. Example: A range of 2 weeks ± 2 days, 15% probability of exceeding 3 weeks
      • .2 Basis of estimates
      • .3 Project documents updates
        • Activity attributes
        • Assumption log
        • Lessons learned register
  3. 7.3 Determine Budget

    • This aggregating the estimated costs of individual activities or work packages
    • .1 Inputs
      • .1 Project management plan
        • Cost Mabagement Plan
          • Describes how the project costs will be structured into the project budget.
        • Resource management plan
          • Provides information on rates, estimation of travel costs, and other foreseen costs.
        • Scope baseline
          • Includes the project scope statement, WBS, and WBS dictionary details for cost estimation and management
      • .2 Project documents
      • .3 Business documents
        • Business case
          • Identifies the critical success factors for the project, including financia success factors.
        • Benefits management plan
          • Includes the target benefits, such as net present value calculations, timeframe for realizing benefits, and the metrics associated with the benefit
      • .4 Agreements
      • .5 Enterprise environmental factors
      • .6 Organizational process assets
    • .2 Tools & Techniques
      • .1 Expert judgment
      • .2 Cost aggregation
        • Are aggregated by work packages in accordance with the WBS, are then aggregated for the higher component levels of the WBS and, ultimately, for the entire project.
      • .3 Data analysis
        • * Management reserves are an amount of the project budget withheld for management control purposes and are reserved for unforeseen work that is within scope of the project. * Are intended to address the unknown unknowns that can affect a project. *Is not included in the cost baseline but is part of the overall project budget
      • .4 Historical information review
      • .5 Funding limit reconciliation
        • This is accomplished by placing imposed date constraints for work into the project schedule.
      • .6 Financing
        • Involves the acquisition of funds for projects
    • .3 Outputs
      • .1 Cost baseline
        • Is developed as a summation of the approved budgets for the different schedule activities, used as a basis for comparison to actual results.
      • .2 Project funding requirements
        • Are derived from the cost baseline.
      • .3 Project documents updates
        • Cost estimates
        • Project schedule
        • Risk register
  4. 7.4 Control Costs

    • This monitoring the status of the project to update the project costs and managing changes to the cost baseline
    • .3 Outputs
      • .1 Work performance information
      • .2 Cost forecasts
      • .3 Change requests
      • .4 Project management plan updates
        • Cost baseline
        • Cost management plan
        • Performance measurement baseline
      • .5 Project documents updates
        • Assumption log
        • Basis of estimates
        • Cost estimates
        • Lessons learned register
        • Risk register
    • .2 Tools & Techniques
      • .1 Expert judgment
        • Include: Variance analysis, Earned value analysis, Forecasting, and Financial analysis
      • .2 Data analysis
        • Earned value analysis
          • Earned value analysis (EVA).
            • Compares the performance measurement baseline to the actual schedule and cost performance.
            • Planned value (PV)
              • It is the authorized budget planned for the work to be accomplished for an activity or work breakdown structure (WBS) component, not including management reserve.
              • is also known as budget at completion (BAC).
            • Earned value (EV)
              • It is the budget associated with the authorized work that has been completed.
              • Is used to calculate the percent complete of a project.
            • Actual cost (AC)
              • Is the realized cost incurred for the work performed on an activity during a specific time period
        • Variance analysis
          • Cost variance (CV = EV – AC),
            • Is the amount of budget deficit or surplus at a given point in time, it indicates the relationship of physical performance to the costs spent.
          • Schedule variance (SV = EV – PV),
            • Is a measure of schedule performance
            • It is the amount by which the project is ahead or behind the planned delivery date, at a given point in time.
          • Schedule performance index (SPI) = EV/PV.
            • Is a measure of schedule efficiency
            • An SPI value less than 1.0 indicates less work was completed than was planned..
            • An SPI greater than 1.0 indicates that more work was completed than was planned.
          • The cost performance index (CPI) = EV/AC.
            • Is a measure of the cost efficiency of budgeted resources
            • CPI value of less than 1.0 indicates a cost overrun for work completed.
            • A CPI value greater than 1.0 indicates a cost underrun of performance to date.
        • Trend analysis
          • Examines project performance over time to determine if performance is improving or deteriorating.
          • Charts.
            • In earned value analysis, three parameters of planned value, earned value, and actual cost can be monitored and reported on both a period-by-period basis (typically weekly or monthly) and on a cumulative basis.
          • Forecasting
            • EAC forecasting approach is a manual, bottom-up summation by the project manager and project team.
        • Reserve analysis
      • .3 To-complete performance index
        • a measure of the cost performance that is required to be achieved with the remaining resources in order to meet a specified management goal,
      • .4 Project management information system
    • 01 Inputs
      • .1 Project management plan
        • Cost management plan • Cost baseline • Performance measurement baseline
      • .2 Project documents
        • Lessons learned register
      • .3 Project funding requirements
        • Include projected expenditures plus anticipated liabilities.
      • .4 Work performance data
        • Contains data on project status such as which costs have been authorized, incurred, invoiced, and paid.
      • .5 Organizational process assets

Informationen

Beschreibung
Mindmap am 7. PROJECT COST MANAGEMENT, erstellt von MARILUZ TAYPE ALMONACID am 14/05/2018.