SAB5#47_Monitoring-Controlling_Scope

Israel Miranda Torres Spanisch

SAB5#47_Monitoring-Controlling_Scope

Inhalt der Mindmap

SAB5#47_Monitoring-Controlling_Scope

  • TIP#1: Control Scope can happen at any time (  either before or after Validate Scope),  because project changes can happen at any time.  TIP#2: Validate Scope  is usually the last Scope Management process that you’ll do in a project. 
  1. Work Performance Data

  2. Scope BaseLines

  3. Iterative

    • Control Quality
    • Validate Scope
    • Monitor Project Work
    • Close Project
  4. Variance analysis

    • Analyzing the difference between the baseline and the actual work to figure out if the plan needs to be corrected
  5. Updating :

    • 1.- Scope
    • 2.- Plan BaseLine
    • 3.- WBS info
    • 4.- Work performance information
    • 5.- Lessons Learned
    • 6.- Project Management Plan
  6. Project Management Plan

  7. Requirement documentation

  8. Requirements traceability matrix

  9. Change requests

  10. Monitoring & Controlling

Bilder und Dateien der Mindmap

  • SAB5#47_Monitoring-Controlling_Scope
  • SAB5#47_Monitoring-Controlling_Scope

Informationen

Beschreibung
Mindmap am SAB5#47_Monitoring-Controlling_Scope, erstellt von Israel Miranda Torres am 11/04/2015.
Aufrufe
3
Verlauf
  • Erstellt von Maria Gonzalez · 11 Apr 2015
  • Kopiert von Israel Miranda Torres · 11 Apr 2015
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck