Mind map about cost types: variable costs, fixed costs, direct costs and indirect costs

Mind map: cost types

Inhalt der Mindmap

SAB6 #72 Cost_Types

  1. Variable costs

    • These costs change with the amount of production or the amount of work
      • Examples, include the cost of material, supplies anda wages
  2. Fixed Costs

    • These costs do not change as production changes
      • Examples include the cost of set-up,ret,utilities. etc.
  3. Direct Costs

    • These costs are directly attributable to the work on the project
      • Examples are team travel, team wages, recognition, and costs of material used on the project
  4. Indirect Cost

    • Indirect costs are overhead items or costs incurred for the benefit of more than one project
      • Examples include taxes,fringe benefits, and janotorial services

Informationen

Beschreibung
Mindmap am SAB6 #72 Cost_Types, erstellt von gcamachof123 am 17/06/2015.
Erstellt von
gcamachof123
Aufrufe
13
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck