  1. Scope Levels

    • Activity
      • These are the actions or tasks to be performed in a work package
    • Work Package
      • It consists of a set of activities or tasks to be performed
    • Control Account
      • it is made up of a set of work packages which analyzes the scope, time and cost to a higher level
  2. Category Requirements

    • Business
      • need for high level of the company
    • Stakeholders
      • need for a person or group
    • Functional
      • product performance
    • Nonfunctional
      • environmental conditions required to produce the product
    • Transition
      • need to adapt to operate the product
    • Project
      • Processes and devices required to operate the project
    • Quality
      • criteria necessary to meet project requirements
    • Technical
      • Definition of how the product will be built

Informationen

Beschreibung
PMP Credential Taller PMP Mindmap am 043_&_044_Scope Levels_&_Category Requirements, erstellt von Alejandro Becerra am 27/02/2016.
Erstellt von
Alejandro Becerra
Aufrufe
1
Verlauf
  • Erstellt von Jou M · 27 Feb 2016
  • Kopiert von Alejandro Becerra · 27 Feb 2016
Bewertung

Mehr zu Collect Requirements

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck