  1. INTEGRATE CHANGES

    • Sustainability
    • BIM
    • Building services design
    • UK Gov construction stategy
  2. OLD RIBA STAGE

    • A: Appraisal
      • B: Design Brief
        • C: Apraisal
          • D: Design Development
            • E: Technical Design
              • F1 & F2: Production information
                • G: Tender Documentation
                  • H: Tender Action
                    • J: Mobilisation
                      • K: Construction to PC
                        • L: Post PC
  3. NEW RIBA STAGE

    • 1: PREPARATION
      • 2: CONCEPT DESIGN
        • 3: DEVELOPED DESIGN
          • 4: TECHNICAL DESIGN
            • 5: SPECIALIST DESIGN
              • 6: CONSTRUCTION (OFF + ONSITE)
                • 7: USE AND AFTERCARE
  4. PROPOSALS

    • Abolish A - L stages and replace with 7 point schedule of works incorporating:
      • intellegent commissioning
      • soft landings
      • project outcomes
      • differing stages of planning
      • UK & international use
      • Private + public sector
      • Differing project sizes
  5. KEY CHANGES

    • Work stages reduced from 11 to 7 & aligned with the CIC sch of services
    • Stages A & B have been merged into 1 intitial 'preparation stage'
    • Stages F to L have been simplified and re-numbered
    • Job specific flexibility replaces the single description of tasks used in the Plan of works 2007
    • Planning is accounted for in the design process
    • Sustainability and BIM have been incorporated with the introduction of BIM 'overlay' and 'Green Overlay'
  6. GREEN OVERLAY

    • Provides a framework for the inclusion of sustainability in the apprisal, breifing, design and construction process.
    • the overlay takes the existing plan as a starting point add guidance notes and highlights additional actions to promote the construction of sustainable buildings.

Informationen

Beschreibung
Mindmap am RIBA PLAN 2013 consultation, erstellt von alison_patey0437 am 08/05/2013.
Erstellt von
alison_patey0437
Aufrufe
116
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck