Gestalte GoConqr mit. Was sollen wir als Nächstes hinzufügen?

Mindmap

IV Maintenance

ruba farhat Englisch

IV Maintenance

Inhalt der Mindmap

IV Maintenance

  1. IV Tubing

    • Check for Kinks
    • Primary line changed q72h
    • Secondary line changed q24h
    • TPN line changed q24h
    • Ensure no air bubbles
    • Check the date on the label
    • Check for leaks
    • Drip chamber is dripping
    • Occlusions
  2. IV Bag

    • Check the order
    • what is already hanging
    • Changed q24h
    • Volume in the bag
    • Check the rate and volume to be infused
  3. IV Site

    • Patent
    • Infiltration
    • Phlebitis
    • Saline Lock
    • Can you Flush it
    • Swollen?
    • Cold to touch?
    • Warm to touch
    • Painful?
  4. Pump

    • Is it plugged in?
    • Flow Rate (mL/hr)
    • Is it beeping?
    • Roller clamp open
    • Check the Order
  5. Gravity

    • Drops (ggt)/min
    • Roller clamp
  6. Hourly Checks

Bilder und Dateien der Mindmap

  • IV Maintenance
  • IV Maintenance
  • IV Maintenance
  • IV Maintenance

Informationen

Beschreibung
Mindmap am IV Maintenance, erstellt von ruba farhat am 24/10/2017.
Erstellt von
ruba farhat
Aufrufe
0
Bewertung

Mehr zu IV Administration and Line Care

Feedback

Worum geht es?

Was sollen wir als Nächstes hinzufügen?