Mindmap
IV Maintenance

Inhalt der Mindmap
IV Maintenance
IV Tubing
- Check for Kinks
- Primary line changed q72h
- Secondary line changed q24h
- TPN line changed q24h
- Ensure no air bubbles
- Check the date on the label
- Check for leaks
- Drip chamber is dripping
- Occlusions
IV Bag
- Check the order
- what is already hanging
- Changed q24h
- Volume in the bag
- Check the rate and volume to be infused
IV Site
- Patent
- Infiltration
- Phlebitis
- Saline Lock
- Can you Flush it
- Swollen?
- Cold to touch?
- Warm to touch
- Painful?
Pump
- Is it plugged in?
- Flow Rate (mL/hr)
- Is it beeping?
- Roller clamp open
- Check the Order
Gravity
- Drops (ggt)/min
- Roller clamp
Hourly Checks
Bilder und Dateien der Mindmap
Informationen
- Beschreibung
- Mindmap am IV Maintenance, erstellt von ruba farhat am 24/10/2017.
- Erstellt von
- ruba farhat
- Aufrufe
- 0
- Bewertung
Mehr zu IV Administration and Line Care


