OSA
- EOS Tracker
- Manufacturing OS
- Lean Manager Trained
- 5S Implentation
- Visual Control Implementation
at machine / cell / group
- SMED Workshop min 1 per
quarter
- Hoshin Workshop min 1 per
quarter
- Management Routine Daily
Route
- QRQC min 1 per quarter
- Red Bin Review (daily)
- Go 1st Part (daily)
- TPM WS min 1 per quarter
- Team Based Orga Flash
Meeting
- Value Stream Mapping Initial
performed
- MFG Connections
- SM & Receiving Area
- Receiving Window to balance
workforce
- FIFO Board or Visiual
management (non IT) for A parts
- Supermarket for purchased raw
material
- Delivery Routes
- Raw material withdrawal KANBAN or
visiual pull for delivery routes by
small train or paletts moves
- No small train only PULL process
(KANBAN) Palette (metal strip)/
Octobins (Resin) move
- SFG Production KANBAN small train
Shop Stock
- FG levelling KANBAN Small Train from
shop stock
- Leveling Board Kanban Card trigger
Prod
- Pick FG from production only which
was planed inside our Leveling Board
or IT system based on Prod Plan
- IT system trigger FG Picklist!! Pick from
shop stock(box) or palett at press but
does not trigger the Production
- Shipping Area
- POOL to overcome the peaks and
balance out customer demand and TPA
space needs 1)Sleeping area 2)Excess
area on last row marked RED
- TPA process to open TOTEM / Truck
Shipping Lane (TSL)
- Shipping Window to balance the
floorspace for TOTEM’s & HC
- Customer Service OS
- Demand Variation weekly Control vs.
SCA or RFQ LT
- Waterfall for premium responsibility
- Order confirmation according
agreement
- Scheduling OS
- Prod Plan for the upcoming 4 weeks
(first week daily) on defined concept
BTO or BTF on defined Lot size
- Capacity Planning
- MPS weekly to review and agree on Prod
Plan
- Schedule attainment daily review of
over/under Production incl Action Plan
- EPEI improvement Plan
- Tools assigned to the Press
- Managment Attainmnet report weekly
- Daily attainment report Prod Plan vs.
outbound entry
- Weekly analysis of DOH per DPN inside
the POOL Compare plant vs plant &
region vs. region
- Logistic & Ordering OS
- Short Term by PUS Maker manual daily
Milk Run for A parts
- LEAN Ordering or Deljit ERP weekly Run for
B & C parts
- Term FC thru Customer FC incl long term
capacity thru GTCP or demand management
- Medium Term based on Prod Plan to upload
into ERP and ordering raw material based on
Prod Plan
- EOS IMPLANTATION