GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT

Carla Sotil Chauca Spanisch

PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT

Inhalt der Mindmap

PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT

  1. ANALYZE PROJECT PERFORMANCE

    • INPUTS
      • PROJECT MANAGEMENT PLAN
      • WORK PERFORMANCE INFORMATION
        • KEY DATA POINTS
          • Planned Value
          • Earned Value
          • Actual Cost
          • Budget At Completion
    • DESCRIPTION
      • IHIUGPU
      • PERFORMANCE ANALYSIS
        • Common variances
          • SV
          • CV
        • Common indices
          • SPI
          • CVI
          • TCPI
        • SCHEDULE ANALYSIS
          • Project is ahead of or behind schedule
        • COST ANALYSIS
          • Project is in an over-budget or under-budget
      • FORECASTING
        • Estimate to Complete
          • The expected cost needed to complete all of the remaining work
        • Estimate at Completion
          • The expected total cost of a control account, work package, or the project
        • Variance at Completion
          • Shows whether the project is forecasted to fi nish under or over budget.
        • To-Complete Performance Index
          • It compares work completed to date with budget required to complete the remaining work
      • PERCENTAGE COMPARISIONS
        • Comparing
          • the percent complete
          • to the percent spent
      • TREND ANALYSIS
        • Can decipher or anticipate a potential performance problem
    • OUTPUTS
      • PERFORMANCE MEASUREMENT METHOD
      • FUNDING FORECASTS AND TRENDS
      • CORRECTIVE AND PREVENTIVE ACTIONS
    • THE BICYCLE CASE STUDY
      • ANALYZING OF DATA
      • GRAPHICAL ANALYSIS OF DATA
        • Graphical Display of PV, EV, and AC
        • Graphical Display of At Completion Data and Forecasts
        • Graphical Display Project Variances
        • Graphical Display of Project Indices
      • MAMNAGEMENT BY EXCEPTION AND VARIANCE ANALYSIS
    • CONSIDERATIONS
      • MANAGEMENT BY EXPECTION
      • COMMUNICATION WITH EARN VALUE DATA
        • TABLES
        • BAR CHARTS
        • CURBS
    • DEFINITION
      • THE PROCESS OF COMPARING ACTUAL PROJECT COST AND SCHEDULE PERFORMANCE TO THE PERFORMANCE MEASUREMENT BASELINE
  2. DETERMINE MEASUREMENT METHOD

    • INPUTS
      • STATEMENT OF WORK
        • Description of products
      • REQUIREMENTS DOCUMENTATION
      • SCOPE BASELINE
        • Approved version of a scope statement
      • INTEGRATED MASTER SCHEDULE
        • Planned dates for performing activities
      • PROJECT BUDGET
        • The time-phased distribution of funds for the planned work
    • DESCRIPTION
      • DISCRETE EFFORT
        • Methods
          • FIXED FORMULA
          • WEIGHTED MILESTONE
          • PERCENT COMPLETE
          • PHYSICAL MEASUREMENT
        • Can be planned and measured and that yields a specific output.
      • APPORTIONED EFFORT
        • Is estimated as a percentage of the referenced discrete work effort
      • LEVEL OF EFFORT
        • Activities do not directly produce defi nitive end products measureablies
    • OUTPUTS
      • PERFORMANCE MEASUREMENT METHODS
      • CONTROL ACCOUNT PLAN UPDATES
    • CONSIDERATIONS
      • SELECT THE METHOD
        • Characteristics of work
          • Duration and measurability
        • Requirements
        • Measurement units
          • Hours, currency, and other measurable units
        • Level of accuracy to measure
          • Cost, schedule, and performance
        • Risk
      • RULES OF MEASUREMENT
      • MEASUREMENT OF PROCUREMENTS
    • DEFINITION
      • THE PROCESS TO SELECT THE APPROPRIATE METHOD OF PROGRESS EVALUATION FOR EACH WORK PACKAGE

Bilder und Dateien der Mindmap

  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT
  • PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT

Informationen

Beschreibung
Mindmap am PRACTICE STANDARD FOR EARNED VALUE MANAGEMENT, erstellt von Carla Sotil Chauca am 09/06/2018.
Erstellt von
Carla Sotil Chauca
Aufrufe
2
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck