GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

Topic 5 Standard Costing

Kenny 123 Englisch

Inhalt der Mindmap

Topic 5 Standard Costing

  1. Defined

    • Pre- Determine estimated unit cost
  2. 3 Step

    • Establish the pre-determined estimates
    • Collection of actual costs
    • Comparison of actual costs with pre-determine estimates
  3. Purpose

    • 1. To value inventories and cost production
      • 2. Act as a control device by setting standard
  4. Type of variance (Formula)

    • Sales Variance
      • Sales Price Variance
        • [(Actual Price – Std Price)] x Actual Qty Sold
      • Sales Volume Variance
        • [(Actual Qty Sold – Standard Qty Sold)] x Standard Price Per unit
    • Materials Variance
      • Material Usage Variance
        • Standard Price x [(Actual Qty Material – Std Qty Material]
      • Material Price Variance
        • Actual Qty Material x [(Actual Price each Material–Std Price each Material]
    • Labour Variance
      • Labour Rate Variance
        • Actual Hours x [(Actual Rate paid – Std Rate paid)]
      • Labour Efficiency Variance
        • Std Rate x (Actual Hrs – Std Hrs )
    • Variable Overheads Variance
      • Variable Overheads Price Variance
        • Actual Quantity x [(Actual Price – Std Price ]
      • Variable Overheads Efficiency Variance
        • Standard Price x [Actual Qty – Std Qty]
    • Fixed Overheads Expenditure Variance
      • Actual Expenditure – Standard Expenditure

Informationen

Beschreibung
Mindmap am Topic 5 Standard Costing, erstellt von Kenny 123 am 27/07/2019.
Erstellt von
Kenny 123
Aufrufe
0
Bewertung

Mehr zu Standard Costing and Variance Analysis

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck