Mindmap
Costing 2
Inhalt der Mindmap
Costing 2
direct cost
- labour costing
- flat rate £/hr
- all staff=constant rate. labour cost per unit=total hourly salary/units produced per hour
- piecework rate
- straight
- differential
- flat rate £/hr
- labour costing
costing methods
- order costing
- direct material and labour (not overheads)=charged to unit cost
- types of order costing
- batch
- quantity of identical products
- cost collected as one job then divided through batch
- cost
- prime cost=direct material+direct labour
- production cost=prime cost+production overhead
- total batch cost=production cost+general overhead
- cost per unit=total batch cost/batch size
- profit per unit=unit sale price-unit cost
- quantity of identical products
- job
- charge all costs to a particular job.-create job card
- card records-actual labour times,grades of pay, material quantities+prices, time spent in production cost centre, direct expense, absorbed production overhead
- charge all costs to a particular job.-create job card
- contract
- cost unit=job,batch,contract
- batch
- continuous costing
- standard activity, cost centre, total costs are divided equally between the cost units produced
- find average cost per unit
- approaches
- service costing
- process costing
- joint costing
- oil industry
- order costing
fixed costs
- independent of activity level-rent, rates, insurace
- considered constant in short term
- independent of activity level-rent, rates, insurace
variable cost
- vary according to level of activity-direct material cost
- assumed to be linear
sold item=generate income
- must first pay total cost of production =fixed+variabel
- £ left over-profit
- cost analysis techniques are used
- absorption costing
- not distinguish between fixed and variable costs
- total cost=simply allocated to product and profit for a particular project calculated
- not distinguish between fixed and variable costs
- marginal costing
- solely on variable cost, fixed costs classed as monthly bills. dealt with in profit/loss accounting
- marginal cost=variable cost=direct labour+direct material+variable overheads
- break even point, product sales income=total operating cost(variable+fixed) i.e. no profit or loss
- every item sold is to generate income
- income generated=pay for its marginal costs first
- left over=contribution=sales-marginal (variable) costs
- at first=contribution to fixed cost, then to profit.
- consider contribution as money left once variable costs have been paid.
- can get SOC contracts.price customer will pay >variable but insufficient to cover total cost, but the previous jobs pay the fixed cost, therefore as long as variable is paid its all profit
- at first=contribution to fixed cost, then to profit.
- left over=contribution=sales-marginal (variable) costs
- income generated=pay for its marginal costs first
- more reliable
- solely on variable cost, fixed costs classed as monthly bills. dealt with in profit/loss accounting
- absorption costing
- must first pay total cost of production =fixed+variabel