  1. Functional requirements

    • Strength & stability
    • Limit deflection
    • Fire resistance
    • Sound & thermal insulation
    • Moisture resistance
    • Accommodation for services
    • Durability
    • Finishes
    • Appearance
  2. Ground Bearing Slab (AD Part C)

  3. Ground Floor Timber Suspended (AD Part C)

    • Ventilation to be 1500mm2/m run of wall or 500mm2/m2
  4. DPC & DPM

    • Lapped 100 mm and taped
    • Provide impervious layer to prevent capillary action
    • 1200 gauge
  5. Radon (NBS Shortcut 36)

    • Remedial work in suspended floor is to add ventilation to depressurise & DPC and DPM to have aluminium foil backing
    • Solid floor remedial works is to fit a radon sump
      • Radon Sump (BRE Good repair guide Radon solutions)
        • Underfloor space or cavity into which a pipe is inserted and used to extract Radon
        • Radon drawn to low pressure created by fan or the stack effect
  6. Timber floors

    • Notching & Drilling - Trada WIS
    • Openings - Eurocode 5 Span tables
  7. Beam & block

    • Type a config 520 mm C/C

Bilder und Dateien der Mindmap

  • Floor design & const
  • Floor design & const
  • Floor design & const
  • Floor design & const
  • Floor design & const
  • Floor design & const
  • Floor design & const
  • Floor design & const
  • Floor design & const
  • Floor design & const
  • Floor design & const

Informationen

Beschreibung
Mindmap am Floor design & const, erstellt von Matt French am 18/04/2015.
Erstellt von
Matt French
Aufrufe
2
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck