Driven Piles Construction

mdunn7200 Quantity Surveying Fourth Year Englisch

Inhalt der Mindmap

Driven Piles Construction

  1. Minimum Spoil

    • Reducing Disposal Costs
  2. Low Vibration

    • Quiet, Lower Noise Pollution
    • Suitable to Environmentally Sensitive Sites
  3. Construction is not too complex

    • Can be done as single piles
    • Can be done in groups for large scale construction
    • Construction Process - see Figure 2.1
  4. Installed Quickly and Economically

    • When compared to conventional bored piles
  5. Load-Bearing

    • High loads can be applied
    • High Shear Capabilities
    • High Moment Capabilities
  6. Suitability

    • Wide range of challenging ground conditions
      • Sandy Gravel
      • Sand
      • Slit
      • Clay
      • Soft Organic Soils
  7. Piling Rigs can be adapted

    • Allows for Operation in more cramped conditions
      • Low Headroom
      • Confined Spaces

Informationen

Beschreibung
Figure 2.1