6) Construction Surveying
Tertiary control
- Sight rails
- Monitor excavation
- Batter boards
- Control Slopes
- Profiles
- Define the corners&sides of buildings
- Sight rails
Area determination
- Measurement of dimensions
- Straight sided figures
- Figures with irregular boundaries
- Reduction to straight sided figures
- Coordinates
- Straight sided figure with n sides
- Area=½(Y1X2+Y2X3+...+YnX1)-(X1Y2+X2Y3+...+XnY1)
- Straight sided figure with n sides
- Measurement of dimensions
Volume determination
- From dimensions formulae
- Spotshots -grid of observation
- v=A/V(Σsingle depths+2Σdouble depths+3Σtriple depths+4Σquadruple depths)
- Trapezoidal rule
- A=D/2(A1+A2+2A3+...+2An)
- Simpsons rule
- A=D/3(A1+An+4Aeven+2Aodd)
- Contours
- Prismoidal formula
- V=D/3(A1+A5+4[A2+A4]+2[A3]
- V=D/3[A1+An+4Aeven+2Aodd]
- V=D/3(A1+A5+4[A2+A4]+2[A3]
- Simpsons rule for Volumes
- Only applicable to an odd number of sections
- V=d/3(A1+4A2+2A3+4A4+...+2An-2+4An-1+An)
- End Areas
- V=d/2(A1+2A2+2A3+...+2An-1+An)
Mass-Haul diagramm
- Drawn after earthwork quantities have been calculated
- Directly below the longitudinal section of the surveyd center line
- Shows accumulated volume at any point
- Can find from it: distance over which cut&fill will balance, quantities of material to be moved and their direction, amounts, etc.
Informationen
- Beschreibung
- 2nd year Construction Surveying Mindmap am 6) Construction Surveying, erstellt von Bianca Kring am 24/01/2017.
- Erstellt von
- Bianca Kring
- Aufrufe
- 1
- Bewertung
Mehr zu Areas, Volumes and Contours