Changes to BR Part L

  1. BACKGROUND

    • baseline requirement for carbon emissions was set out in Part L 2006
    • revised in 2010 Basic principle of amendments: was to reduce carbon emissions by 25% over the baseline in 2006
    • PART L:
      • Ext dwellings
      • New Dwellings
      • New bdg other than dwellings
      • Ext Bdgs other than dwellings
    • Part L is due to be amended in 3013
      • to get in line with Gov aspiration to achieve ZERO CARBON BUILDINGS by 2016 (dwellings)/ 2019 (bdg other than dwellings)
      • ZERO CARBON for the public sector buildings may be required before 2019
  2. PART L IN 2013

    • proposal for october 2013
  3. COMPLIANCE WITH 2010 REGS

    • compliance is demonstrated by calculating a target CO2 emission rate (TER) based on a notional building & and actual CO2 emission rate for the new building
  4. 2013 CHANGES

    • For new bdgs no changes to TER approach
    • higher level of fabric efficiency. meaning that renewable tech cannot be used as a means of getting a building with a flimsy fabric and services arrangement through Part L. In respect to NCM Modelling guide requires a certain standards such as U values must be achieved.
    • 2013 standard will be pushed harder & there is a strong argument 4 g8ter differentiation between notional buildings
    • the preferred option is a 20% improvement of the 2010 regs - achieved through a more challenging package of fabric and services improvements and then PV array equaling 1.6% of floor area is added
  5. IMPLICATIONS FROM 2010

    • NEW BUILD DWELLINGS & OTHER BDGS
      • COS emission must b calc by est. a target emission rate for the building (notional) and an emission rate based on the bdg as designed/constructed (actual)
      • target emission rate is TER
      • The bdg emission rate is referred to as the DER for Dwellings & BER for other bdgs
      • in order to comply with BR the BER/DER 4 the bdg as constructed must b no g8ter than the TER
      • the fabric and services installation should achieve a reasonable performance standard

Informationen

Beschreibung
Mindmap am Changes to BR Part L, erstellt von alison_patey0437 am 08/05/2013.
Erstellt von
alison_patey0437 · Mai 2013
Aktualisiert
19 Feb 2016
Aufrufe
46
Bewertung

Feedback

Worum geht es?

Was sollen wir als Nächstes hinzufügen?