The RIBA Plan of Work 2013 Unit 5 M1 Preparation

Tom Jones7007 20 Fragen

Quiz starten

Fragen in diesem Quiz (20)

  1. 1How may stages are in the RIBA Plan of work 2013
    1. A7
    2. B5
    3. C10
    4. D8
    5. E12
  2. 2Which part of the stage of the RIBA Plan of Work 2013 is particularly relevant in the context of sustainability.
    1. AStage 4
    2. BStage 1
    3. CStage 0
    4. DStage 7
    5. EStage 5
  3. 3Stage 6 is primarily concerned with?
    1. APost occupancy
    2. BConcept design
    3. CPreparation and brief
    4. DHand over and close out
    5. EDeveloped design maps
  4. 4What does BIM stand for
    1. ABuilding Information Modelling
    2. BBusiness Information Modelling
    3. CBuilt Individual Model
    4. DBuilding In Materials
  5. 5Which stage is a new stage in which a project is strategically appraised and defined before a detailed brief is created?
    1. AStage 4 Technical Design
    2. BStage 5 Construction
    3. CStage 0 Strategic Definition
    4. DStage 3 Developed Design
  6. 6Which stage of the RIBA plan of Work focuses on making sure the that the initial business case matches the desired outcomes.
    1. AStage 7 In use
    2. BStage 0 Strategic definition
    3. CStage 6 Handover and close out
    4. DStage 3 Developed design
    5. EStage 5 Construction
  7. 7What is meant by the term procurement?
    1. AThe design and execution of the infrastructure .
    2. BThe construction of an object or a system.
    3. CThe acquisition of goods, services or works from an outside external source.
    4. DPreparing for and forming building systems.
  8. 8Is The RIBA Plan of Work 2013 itself a contractual document?
    1. AYes
    2. BNo
  9. 9Within the RIBA Plan of work which task bars are fixed and always present?
    1. ATask Bar 1 Core Objectives, Task Bar 3 Programme & Task Bar 8 Government Gateways.
    2. BTask Bar 8 Government Gateways, Task Bar 6 Sustainability Checkpoints & Task Bar 3 Programme
    3. CTask Bar 1 Core Objectives,Task Bar 5 Key Support Tasks, & Task Bar 7 Information Exchanges
    4. DTask Bar 6 Sustainability Checkpoints,Task Bar 4 (Town) Planning &Task Bar 2 Procurement
  10. 10Which two task-bars can be switched on or off in The RIBA Plan of Work 2013?
    1. ATask Bar 6 Sustainability Checkpoints & Task Bar 8 Government Gateways.
    2. BTask Bar 3 Programme & Task Bar 1 Core Objectives.
    3. CTask Bar 2 Procurement & Task Bar 5 Key Support Tasks,
    4. DTask Bar 8 UK Government Information Exchanges & Task Bar 6 Sustainability Checkpoints.

Informationen

Beschreibung
To complete this test you will need to refer to the following links. http://www.ribaplanofwork.com/Default.aspx http://www.youtube.com/watch?v=98UGXi0nUbs
Sprache
English
Aufrufe
258
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck