power prep Steam turbine Auxiliaries and Operation quiz

TRAVIS CANNING 33 Fragen

Quiz starten

Fragen in diesem Quiz (33)

  1. 1In a large steam turbine lubricating oil system the function of the oil is to lubricate and ___________ the bearings.
    1. Akeep dirt out of
    2. Bpolish
    3. Ccool
    4. Dkeep moisture away from
    5. Esupport
  2. 2what type of instrumentation ins installed on the discharge side of an oil lubricated bearing
    1. Aoil filter
    2. Bmoisture separator
    3. Cdewpoint monitor
    4. Dflow measuring device
    5. Ethermometer
  3. 3When a turbine is left cold and at a standstill, the weight of the rotor will tend to cause the rotor to sag slightly, this is also referred to as
    1. Abowing
    2. Bhogging
    3. Csagging
    4. Dwarping
    5. Ebending
  4. 4when a hot turbine rotor has cooled at a standstill, the lower half will cool faster than the upper half. This may cause the rotor to bend upwards which may also be referred to as:
    1. Abowing
    2. Bhogging
    3. Csagging
    4. Dwarping
    5. Ebending
  5. 5when a steam turbine is shut down it should be put on barring gear for a minimum of:
    1. A3 hours
    2. B24 hours
    3. C72 hours
    4. Das determined by the plant manager
    5. Ebarring should never be shut off
  6. 6Barring gear shaft rotation is typically:
    1. A1-3 rpm
    2. B5-10 rpm
    3. C20-40 rpm
    4. D60 rpm
    5. E3600 rpm
  7. 7while large steam turbine is on barring gear what other system should be placed in service
    1. Alube oil coolers
    2. Blube oil filtering
    3. Chydrogen sealing
    4. Dstator water
    5. Ejacking oil
  8. 8which of the following is not a type of steam turbine governing:
    1. ANozzle
    2. BThrottle
    3. COverload
    4. DBypass
    5. EImpulse
  9. 9Nozzle governing is utilized on __________ turbines
    1. Aimpulse
    2. Breaction
    3. Ccondensing
    4. Dextraction
    5. Eimpulse or reaction turbines
  10. 10Nozzle governing
    1. Aopens a nozzle from 0 % to 100 % as the load is increased on a turbine
    2. Bopens a series of nozzles in succession as the load is increased
    3. Cutilizes flyball weights to control a steam valve
    4. Dis used on the later stages of an impulse turbine to control speed
    5. Enone of the above

Informationen

Beschreibung
power engineering 3b2 Quiz am power prep Steam turbine Auxiliaries and Operation quiz, erstellt von TRAVIS CANNING am 27/02/2016.
Sprache
English
Aufrufe
50
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck