  1. 1The SAP Going Live Check is split into two sections: Analysis and Verification. What are the recommendations regarding delivery of these sessions?

    (More than one answer is correct. Please choose the correct answers.)
    1. AAll sessions should be delivered before the project go-live.
    2. BAll sessions should be delivered after the project go-live.
    3. CGoing Live Analysis is conducted at minimum four weeks before the project go-live, during the realisation phase.
    4. DGoing Live Verification is scheduled after the start of production, during the Go Live Support phase.
    5. EAll sessions are delivered by certified consultants from SAP Active Global Support through a remote connection.
  2. 2Which are the deliverables of the Technical Solution Management work stream in the Realisation phase?
    1. ADefine General Settings and Master Data.
    2. BQuality Assurance Environment (QAS).
    3. CTechnical Solution Design.
    4. DTechnical Operations and Handover Plan.
    5. ESAP Going Live Check,
  3. 3What is the purpose of the Technical Solution Management work stream in the project preparation phase?

    (One answer)
    1. ATo define General Settings and Master Data for the project.
    2. BTo deliver QA and Production environments and finalize the development of the operations handbook.
    3. CTo define and develop the Organisational and Production Support Readiness Check
    4. DTo start preparation of essential technical and infrastructure deliverables that support the initial project planning of an SAP implementation project.
    5. ETo prepare a strategy to hand off operations of the solution landscape to the post-production support organisation.
  4. 4Which are the tasks of the deliverable 'Development Environment (DEV)' in the Blueprint phase?

    (More than one answer is correct. Please choose the correct answers.)
    1. AExecute Technical Installation of SAP Products for DEV
    2. BCreate master data in DEV environment - Master Data #1 - n
    3. CConduct Design Review Service
    4. DPerform Manual Configuration in DEV
    5. EImport Configuration and Development Objects to QAS
  5. 5Which transaction code in SAP Solution Manager is used to set up project documentation standards?

    (One answer)
    1. ASOLAR01
    2. BRMMAIN
    3. CSOLAR02
    4. DSOLAR_PROJECT_ADMIN
    5. ESOLAR_LEARNING_MAP

Informationen

Beschreibung
Diploma ASA380 - ASAP Implementation Methodology Quiz am ASAP 8 Methodology Technical Solution Management Work Stream Quiz , erstellt von kim.t.dowling am 16/03/2016.
Sprache
English
Aufrufe
50
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck