Quiz
Kaplan - CDs 2009 [Cost Estimates] Chapter Quiz Questions
Fragen in diesem Quiz (2)
1An architect's preliminary estimate of construction cost would consider all of the following EXCEPT:
I. labor and materials supplied by the owner.
II. cooling towers.
III. land acquisition costs.
IV. the architect's fee.
V. metal curtain wall systems- AA. I only
- BB. I and IV
- CC. None, everything would be considred
- DD. III and IV
2An architect who prepares a preliminary estimate of construction cost according to the subsystems method
- AA. considers one set of subsystems for concrete buildings and a different set for steel buildings.
- BB. can easily analyse the cost of alternative exterior wall systems.
- CC. would most likely use this method during the schematic design phase.
- DD. would be performing an additional service under the AIA Agreement between Owner and Architect.
Informationen
- Beschreibung
- Kaplan Study Guide
- Autor
- Tiffany Brown
- Sprache
- English
- Aufrufe
- 45
- Schlagwörter
- Bewertung
- Noch keine Bewertungen Bewerte dieses Quiz