GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Quiz

WC case study revision

Christie Woodford 6 Fragen

Quiz starten

Dieses Quiz enthält Fragetypen, die sich im gewohnten Player öffnen.

Fragen in diesem Quiz (6)

  1. 1Volvo needed to combine their [blank_start]sensor data with operational data[blank_end] to deliver compelling offers and great customer service. Using WhereScape, they now have an [blank_start]integrated EDW[blank_end] with a [blank_start]single global modelling standard[blank_end]. They have a [blank_start]360 cross functional view[blank_end] of their data. They achieved this [blank_start]10x faster[blank_end] than with traditional methods. They are experiencing much quicker [blank_start]BI[blank_end] and reduced [blank_start]time to market[blank_end].
    1. Asensor data with operational data
    2. Bintegrated EDW
    3. Csingle global modelling standard
    4. D360 cross functional view
    5. E10x faster
    6. FBI
    7. Gtime to market
  2. 2Vodafone spent [blank_start]9 months[blank_end] and high cost on integrating a core system which resulted in [blank_start]poor data quality and unusable reports[blank_end]. Using WhereScape, they were able to leverage the power of [blank_start]Teradata[blank_end] and [blank_start]Data Vault[blank_end] and working in an [blank_start]agile[blank_end] manner. The time to market is now [blank_start]days[blank_end] rather than [blank_start]6 months[blank_end]. They have been able to start decommissioning their ETL tool creating not only a saving in cost but also time. Vodafone now load data in [blank_start]10%[blank_end] of the time previously taken.
    1. A9 months
    2. Bpoor data quality and unusable reports
    3. CTeradata
    4. DData Vault
    5. Eagile
    6. Fdays
    7. G6 months
    8. H10%
  3. 3Renold needed to manage the data from their [blank_start]13[blank_end] ERP systems in a consistent way and ensure it is ready for their new ERP system. On [blank_start]day one[blank_end] of the POC Renold had clean, consistent sales intelligence which they had never seen before. Their legacy, daily reports are now down to [blank_start]30 seconds[blank_end] rather than [blank_start]hours[blank_end] and are [blank_start]accurate[blank_end]. The time to [blank_start]download, enhance and reconcile data[blank_end] is [blank_start]30 seconds[blank_end] rather than [blank_start]3.5 days[blank_end]. They have greater market knowledge for sales and a better understanding of reseller/distributor needs.
    1. A13
    2. Bday one
    3. C30 seconds
    4. Dhours
    5. Eaccurate
    6. Fdownload, enhance and reconcile data
    7. G30 seconds
    8. H3.5 days
  4. 4Xerox formally had disconnected, disparate data from 16 countries with rigid reporting. Using WhereScape, Xerox built a DW which shows their full portfolio and was build [blank_start]95%[blank_end] singlehandedly. Report latency was down to [blank_start]24 hours[blank_end] from [blank_start]30 days[blank_end]. Xerox estimate that if they used their own tool it would have cost them [blank_start]3x[blank_end] as much and taken [blank_start]4x[blank_end] as long. Within a matter of weeks their [blank_start]credit approval system[blank_end] was [blank_start]3x[blank_end] more efficient.
    1. A95%
    2. B24 hours
    3. C30 days
    4. D3x
    5. E4x
    6. Fcredit approval system
    7. G3x
  5. 5Using WhereScape, Athlon achieved in [blank_start]one week[blank_end] what was anticipated to take [blank_start]one year[blank_end]. [blank_start]7,000[blank_end] objects were built into [blank_start]raw ODS[blank_end]/[blank_start]Data Vault[blank_end] (from source - [blank_start]7[blank_end] different countries).
    1. Aone week
    2. Bone year
    3. C7,000
    4. Draw ODS
    5. EData Vault
    6. F7
  6. 6VW needed to rapidly deliver BI solutions in an iterative fashion. Their dream was to be able to [blank_start]change any single component[blank_end] and [blank_start]auto-trigger a cascade of changes[blank_end]. In project one, VW were loading data to their tech dw layer [blank_start]6x[blank_end] faster. They were seeing the reduction of [blank_start]cost and risk[blank_end] whilst experiencing an [blank_start]accelerated time to market[blank_end]. VW used [blank_start]rapid prototyping[blank_end] to quickly understand the business requirements, [blank_start]implement[blank_end] them and make them [blank_start]operational[blank_end]. The IT team no longer have to [blank_start]retreat to their quiet zone[blank_end] before the results are seen.
    1. Achange any single component
    2. Bauto-trigger a cascade of changes
    3. C6x
    4. Dcost and risk
    5. Eaccelerated time to market
    6. Frapid prototyping
    7. Gimplement
    8. Hoperational
    9. Iretreat to their quiet zone

Informationen

Beschreibung
Quiz am WC case study revision, erstellt von Christie Woodford am 20/10/2017.
Sprache
English
Aufrufe
0
Schlagwörter
misc
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck