  1. 1Which of the following correctly define allowances?
    1. AIs the architect's estimated cost of a particular material or piece of equipment when the actual cost cannot be precisely determined at the time of the bid or negotiated proposal
    2. BIs the contractor's estimated cost of a particular material or piece of equipment when the actual cost cannot be precisely determined at the time of the bid or negotiated proposal
    3. CIs a placeholder so that some amount of money can be set aside for an item
  2. 2Each allowance should cover the cost to the contractor of which of the following?
    1. AThe Item
    2. BDelivery to the Job Site
    3. CAll required taxes
    4. DUnloading
    5. EHandling
    6. FInstalling the item
    7. GContractor's overhead
    8. HContractor's profit
  3. 3Allowances are not intended to cover which of the following and should instead be included in the Contract Sum?
    1. AContractor's Overhead
    2. BContractor's Profit
    3. CUnloading
    4. DHandling
    5. EInstallation
    6. FThe Item
    7. GDelivery to the Job Site
    8. HAll required taxes
  4. 4Which of the following correctly apply to "Construction Schedule," according to Article 3 "Contractor," of A201 General Conditions of the Contract for Construction?
    1. AThe contractor is obligated to provide a construction schedule for the owner's and architect's information
    2. BThe contractor is obligated to keep the construction schedule up to date
    3. CThe contractor is obligated to conform to and follow the construction schedule
    4. DThe architect is obligated to provide a construction schedule for the owner's and contractor's information
  5. 5Which of the following correctly apply to "Record Documents," according to Article 3 "Contractor," of A201 General Conditions of the Contract for Construction?
    1. AThe contractor must maintain record documents at the job site
    2. BThe record documents must be available for the architect's reference during construciton
    3. CThe architect must maintain record documents at the job site
  6. 6Copies of which of the following correctly apply to Record Documents?
    1. AConstruction Drawings
    2. BSpecifications
    3. CContract Documents
    4. DDocuments marked to record exactly how the project was built
    5. ENoting any changes or deviations from the original documents
    6. FExact requirements for these documents should be included by the architect in Division 01 of the specifications
  7. 7Which of the following correctly apply to "Submittals," according to Article 3 "Contractor," of A201 General Conditions of the Contract for Construction?
    1. AThe contractor may be required to submit shop drawings, product data, and samples, according to the contract documents
    2. BAre not contract documents
    3. CSubject to the architect's review
    4. DThe contractor must keep one copy of all submittals at the job site
    5. EAre contract documents
    6. FShow how the contractor proposes to carry out the design concept expressed in the contract documents
  8. 8Which of the following are typically considered submittals?
    1. AShop Drawings
    2. BProduct Data
    3. CSamples
    4. DContract Documents
  9. 9Which of the following correctly apply to "Design Services," according to Article 3 "Contractor," of A201 General Conditions of the Contract for Construction?
    1. AThe contractor can be required to provide professional design services or certifications
    2. BThe contractor can be required to provide professional design services or certifications if specifically required to do so by the contract documents
    3. CThe contractor may need to provide such services in order to carry out the work of the contract
    4. DIf the contractor needs to provide design services, the architect must specify all the performance and design criteria that such services must satisfy
    5. EIs sometimes called Design Delegation
    6. FLegally, it is a form of design allocation by the owner because there is no contractual relationship between the architect and the contractor
    7. GAllows the use of performance specifications for products and building assemblies
    8. HCan also let the contractor select the best approach to completing the work
    9. IThe contractor may provide these services in house or through hiring a consultant such as an engineer, designer, architect, etc
    10. JThe contractor can be required to provide professional design services or certifications if the owner is dissatisfied by the architect's work
  10. 10Which of the following correctly apply to "Indemnification," according to Article 3 "Contractor," of A201 General Conditions of the Contract for Construction?
    1. ATo the extent provided by law, the contractor will indemnify and hold harmless the owner, architect, and architect's consultants, and agents against claims, damages, and expenses arising from performance of the work
    2. BTo secure against loss or damage
    3. CDoes not relieve the architect of his or her liability for errors in the drawings, specifications, or administration of the contract
    4. DProtects the owner and architect against situations where a person is injured or property (other than the work itself) is damaged due to the negligence of the contractor or the contractor's agents
    5. ERelieves the architect of his or her liability for errors in the drawings, specifications, or administration of the contract
    6. FProtects only the owner against situations where a person is injured or property (other than the work itself) is damaged due to the negligence of the contractor or the contractor's agents

Informationen

Beschreibung
Architectural Registration Exam - NCARB A.R.E 5.0 Project Management Quiz am Contracts Part 2, erstellt von Marita Rose am 26/02/2018.
Sprache
English
Aufrufe
0
Verlauf
Erstellt am 26 Feb 2018 · aktualisiert am 6 Mär 2018
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck