Screeding Quiz

Beschreibung

Quiz am Screeding Quiz, erstellt von Steve Lockwood am 05/11/2014.
Steve Lockwood
Quiz von Steve Lockwood, aktualisiert more than 1 year ago
Steve Lockwood
Erstellt von Steve Lockwood vor mehr als 9 Jahre
428
0

Zusammenfassung der Ressource

Frage 1

Frage
1. How much mixed material is needed to complete a floor screed 5.000 m long by 4.000 m wide and 0.050 m thick?
Antworten
  • 0.25 m3
  • 0.5 m3
  • 1 m3
  • 1.5 m3

Frage 2

Frage
2. Tools and equipment for floor screeding will generally include:
Antworten
  • sweeping brush, trowel, float, mixer, shovel
  • splash brush, small tool, gauger, trowel, float
  • spirit level, trowel, buckets, mixer, float
  • levelling equipment, trowel, float, shovel buckets, mixer

Frage 3

Frage
Plastic sheeting below the structural floor is the:
Antworten
  • damp proof membrane
  • vapour barrier
  • moisture trap
  • aid to curing the floor

Frage 4

Frage
The type of cement used in floor screeds is:
Antworten
  • Masonry Portland
  • Extra Portland
  • Rapid Portland
  • Ordinary Portland

Frage 5

Frage
Sands used for floor screeding:
Antworten
  • should contain a high proportion of fine grains
  • should contain a high proportion of large grains
  • can be any type
  • should be sharp and well graded

Frage 6

Frage
Ready-mixed screeds are:
Antworten
  • prepared off site and delivered as required
  • prepared after work for the following day
  • prepared in the morning for use during the day
  • used only for self-levelling floors

Frage 7

Frage
Screed rails or battens are used to:
Antworten
  • help delivery of screed material to the workstation
  • assist in forming the main area of floor
  • tamp down the surface of the screed
  • form channels for drainage

Frage 8

Frage
The purpose of a damp proof membrane is to:
Antworten
  • assist the passage of moisture
  • assist in the curing process
  • allow the screed to dry out quickly
  • prevent the passage of moisture

Frage 9

Frage
Cracking of large area floors may be reduced by:
Antworten
  • use of more cement
  • use of expansion strips
  • adding more sand
  • a self-levelling compound

Frage 10

Frage
Battens used as a guide for screeds may be:
Antworten
  • set out from datum lines
  • laid at 50 mm depth
  • set out from base floor
  • laid to form 75 mm depth

Frage 11

Frage
The most accurate proportioning of floor screeding materials:
Antworten
  • is by weight
  • is important near heavily trafficked areas
  • can be carried out using shovels
  • can be carried out using buckets

Frage 12

Frage
The correct consistency for floor screeding materials is:
Antworten
  • as dry as possible
  • slurry like
  • semi wet
  • semi dry

Frage 13

Frage
Mixing of screed material:
Antworten
  • does not have to be thorough as it will be spread by shovel
  • needs to be consistent or wear will take place
  • should be carried out as slowly as possible
  • can take place after water has been added

Frage 14

Frage
Compacting screeds results in a:
Antworten
  • lightweight screed
  • quicker set screed
  • more dense screed
  • slower set screed

Frage 15

Frage
Compacting can be carried out with a:
Antworten
  • screed rail
  • datum
  • rule or float
  • level

Frage 16

Frage
High volumes of ventilation:
Antworten
  • will aid the setting process
  • will not affect the screeds after laying
  • will allow the cement to harden quickly
  • may make the surface of the screed dusty

Frage 17

Frage
The finish on a floor screed:
Antworten
  • is not important as it will all be covered up
  • is important as it may show through the final covering
  • can be completed the next day
  • can be completed by the floor layer with the finish

Frage 18

Frage
Laying polythene sheet on the floor screed after laying will:
Antworten
  • act as an accelerator to the set
  • produce an even surface
  • allow the cement to set naturally
  • keep the floor soft for the next process

Frage 19

Frage
The purpose of curing is to:
Antworten
  • allow the cement to set and harden over a long period
  • produce an even surface
  • produce a lightweight screed
  • aid compaction to take place

Frage 20

Frage
Where drainage outlets are fitted:
Antworten
  • the floor must be laid from this point
  • they can be repositioned later
  • the floor can be altered to fit when finish is applied
  • the drainage contractor will alter them to suit
Zusammenfassung anzeigen Zusammenfassung ausblenden

ähnlicher Inhalt

Deutsche Bundeskanzler(Amtszeiten)
max.grassl
Essay schreiben - Tipps
AntonS
IKA-Theoriefragen Serie 19 (15 Fragen)
IKA ON ICT GmbH
Analyse und Vergleich von Texten (Epik, Lyrik und Dramatik)
lilith.m
Fragenkatalog Wirtschaftspolitik
Isaak Roscher
Gedichtsanalyse und Interpretation
Laura Overhoff
Projektmanagement
zok42.com
PuKW STEP6 - Hummel (Sofort überprüfbar)
Tim Schröder
Vetie - Immuno Wdh SS 2013
V R
Vetie - AVO 2018
Schmolli Schmoll
MS-1.3 Folienpaket 2
Markus Voßmann