GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Quiz

Pega Assessment

anna.buchanan 25 Fragen Aktualisiert am 23 Mär 2017

Quiz starten

Dieses Quiz hat ein Zeitlimit und öffnet sich deshalb im gewohnten Player.

Fragen in diesem Quiz (25)

  1. 1I want to execute Step 5 straight after Step 2 of an Activity, I use a [blank_start]Jump[blank_end] to do this, if I want to make that conditional, I use a [blank_start]When[blank_end] Rule.
    1. AJump
    2. BWhen
  2. 2When would you consider doing a Ruleset Skim?
    1. AAt the beginning of a project
    2. BAfter a major release
    3. CEvery few months
    4. DAll of the above
  3. 3What is the standard use for a Workpool?
    1. ATo group work-objects and store them in a single work table
    2. BFor storing assigned work
    3. CFor controlling assignment rules
    4. DTo keep the logic for when a work object should be persisted
  4. 4It is a common practice to alter a property beginning with pz at runtime.
    1. ARichtig
    2. BFalsch
  5. 5If you want a Data Page for static data, that is the same for each user, you would use the settings, [blank_start]Node[blank_end] level, and a refresh strategy of [blank_start]1Day[blank_end].
    1. ANode
    2. BRequestor
    3. CThread
    4. D10 Minutes
    5. E3 Hours
    6. F1 Day
  6. 6Edit Inputs are best used when there are unallowed characters in a value, and should always be partnered with a meaningful message
    1. ARichtig
    2. BFalsch
  7. 7How do you see the values of local variables in an Activity?
    1. AYou check the clipboard
    2. BYou check the Parameters
    3. CYou set the tracer to include variables, then check them
    4. DYou include them in the UI
  8. 8In Reports, you can use several charts, a company wants to show how many new purchase requests are placed by various departments (engineering, marketing, HR) a [blank_start]Pie[blank_end] Chart would be best.
    1. ABubble
    2. BPie
    3. CGauge
    4. DSpark
  9. 9The business want more control over their process and so you are considering recommended delegated rules, a good option would be a Flow Rule with descriptive labels, as this is a business friendly BPM style rule.
    1. ARichtig
    2. BFalsch
  10. 10Which statement best describes the goal interval for an SLA?
    1. AThe amount of time allowed before the case automatically advances to the next assignment.
    2. BThe amount of time allowed for a user to advance a case to the next stage.
    3. CThe amount of time in which the case or task should be completed.
    4. DThe amount of time in which the case or task must be completed.

Informationen

Beschreibung
pega quiz for our consultants
Sprache
English
Aufrufe
659
Verlauf
Erstellt am 13 Feb 2016 · aktualisiert am 23 Mär 2017
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck