Quiz
Dovetail Manual Testing 312-344
Erstelle ein kostenloses Konto, um dieses Quiz zu beenden
Speichere deinen Fortschritt und sieh dir dein Endergebnis an.
oder mit deiner E-Mail registrieren
Schon ein Konto? Anmelden
Fragen in diesem Quiz (34)
1which of the following environment is the best suited for testing an app
- Aa. Test environment is sufficient to test before deploying the build into production environment to completely eliminate cost of having a pre-production /production environment cost
- Bb. Any environment can be used as it may not affect the budget of project
- Cc. Pre-production environment should be built of scalable version of actual production environment
2When is the opt for tracking project made available to end user
- Aa. during creation of project process
- Bb. during creation of project
- Cc. while enabling testing metric
- Dd. bench mark updates
3 _______ is mockkups of an application,allowing users to visual an app that has not yet been constructed
- Aa. prototype
- Bb. use case
- Cc. user type
4Process package needs to be approved by?
- AProject Manager
- Bb. Project Lead
- Cc. Quality Champion
- Dd. Quality Analysis
5_____ represents sequence of actions and interactions between them?
- Aflow
- Bdata diagram
6Is it possible to view, create macro from the code options under developer tab?
- ARichtig
- BFalsch
7Event flows does not contain exception, which could cause alternate paths through flow events?
- ARichtig
- BFalsch
8. Risk based Quality mgmt. can assist in determining test strategy for Requirement? -
- ARichtig
- BFalsch
9Corrective action after the defect trend will be taken by (, , , )
- ATest manager
- BTest Lead
- CProject Lead
- DTest Team member
10Test scenarios have a specific case value assigned to them
- ARichtig
- BFalsch
11To perform Function testing, the tester should have complete knowledge of the code or logic
- ARichtig
- BFalsch
12Eligibility for project to be in C20.
- AProject should be Active in ESA
- BProject should be Active in Elm
13Assurance to handle the failure, when a file is in download is done by
- Aa. Internal
l - Bb. External
- Cc. Server
- Aa. Internal
14Test case should be
- AConcurrent Or
- BWell organized & reusable
15. Check style provides checks that find class design problems, duplicate code or bug patterns like double checked locking
- ARichtig
- BFalsch
16Three types of servers
- Aa. Web server
- Bb. Application server
- Cc. Database server
17. % of browsers & OS can be covered as part of testing
- Aa. OS usage testing
- Bb. Usage testing
- Cc. Browser testing
- Dd. Compatibility testing
18What’s get shared
- Aa. Requirements
- Bb. Test plan
- Cc. Test resources
- Dd. Business components
19. Risk based testing is done based on
i.- Aa) test scripts based on highest risk
j. - Bb) test scripts based on highest criticality
k. - Cc) test scripts based on highest risk according to business needs
l. - Dd) all
- Aa) test scripts based on highest risk
20Defect trend is done by
- Ae. a) Test Lead
- Bf. b) Test Manager
- Cg. c) Test Member
- Dh. d) Project Manager
21Now() displays date and time in mm/date/year format
- ARichtig
- BFalsch
22.Document typo error is detected in which step of pareto analysis
- AA why1 (Lack of documentation skills)
- BB why 2(Lack of trained resources)
- CCwhy 3 (Lack of Training)
- DD why 4 ( )
23If defect is valid & rejected by developer then wat wi ll tester do???
- AA tester reopen in bug tool
- BB contact development mgr
- CC contact test mgr
24Following can not be raised as a defect?
- ANew suggestion
- BNew comments
25pareto analysis is said 80/20 for which reason??
- AA 80% of brainstorm caused by 20% group people
- BB 20% of brainstorm caused by 80% group people
26web application navigation covered in
- A1.functional
- B2.accessibility
- C3.Interface testing
- D4.usability testing
27Requirements errors account for ---percentage of rework
- A1.10
- B2.20
- C3.25
- D4.70 to 85
28Defect report contains
- A1.# raised defects
- B2.# fixed defects
- C3.# reopened defects
29Important Tools
- ARational performance tool- source code/application
- BSilkperformer tool—load test conducts
- CQtest—quality deploy..check for anamolies for immediate correction
- DHPLoad runner—check for bottlenecks in build or deploy
3 macro code ques
30Spike Testing comes under:
- Aa. Load
- Bb. Stress
- Cc. None
- Dd. capacity
31It is more costlier to find defects at the later stages of s/w life cycle
- ARichtig
- BFalsch
32If a error in requirement phase is found at maintenance time it effects 100%(
- ARichtig
- BFalsch
33Work list under Widgets
- Aa. Allocated tasks till date
- Bb. 3.5 months older from start date
- Cc. 4 months older from planned date
- Dd. ------------------
34Well-developed test suite may not be required to achieve automation testing advantage
- ARichtig
- BFalsch
Informationen
- Beschreibung
- Quiz am Dovetail Manual Testing 312-344, erstellt von rabi kr shaw am 19/01/2017.
- Autor
- rabi kr shaw
- Sprache
- English
- Aufrufe
- 152
- Schlagwörter
- Bewertung
- Noch keine Bewertungen Bewerte dieses Quiz