  1. 1Scrum is based on empirical process control theory. All of its artifacts must be transparent to ensure sufficient accuracy of inspection. Select two ways to maintain the Product Backlog to maximize its transparency
    1. AProduct Backlog items are sized appropriately, i.e. not bigger than a Sprint and with a preference for several do-able items in a Sprint
    2. BProduct Backlog is only updated at the Sprint Review, when both the Scrum Team and the stakeholders are available
    3. CProduct Backlog is only updated at a release planning meeting with the stakeholders and the release train engineers present
    4. DThe Product Backlog always has the most actual insights
    5. EProduct Backlog items should hold no more than 8 points of work, which is the average in the range of acceptable sizes of 1, 2, 3, 5, 8 and 13
  2. 2How should Product Backlog items be chosen when multiple Scrum Teams work from the same Product Backlog?
    1. AEach Scrum Team takes an equal number of items
    2. BThe Scrum Team with the highest velocity pulls Product Backlog items first
    3. CThe Product Owner decides
    4. DThe Development Teams pulls in work in agreement with the Product Owner
    5. EThe Product Owner should provide each team with its own Product Backlog
  3. 3A PO (Product Owner) is essentially the same thing as a traditional PM (Product Manager).
    1. ARichtig
    2. BFalsch
  4. 4Every Development Team should have
    1. AThe competencies and skills needed to deliver a Done Increment in a Sprint
    2. BAt least one representative from each major software engineering discipline (like QA, Dev, UX)
    3. COne Lead Developer and no more than 8 other members
  5. 5A done Increment is valuable if
    1. AIt is likely to increase customer satisfaction
    2. BIt meets the business analyst’s specifications
    3. CIt is delivered when the Product Owner expected it
    4. DIt reduces long-term operational costs
    5. EIt has all the features that the Product Owner wanted in that Sprint
  6. 6There are multiple teams working on one product. Each team should have a separate Product Owner.
    1. ARichtig
    2. BFalsch
  7. 7The Product Owner must release each Increment to production
    1. AWithout exception
    2. BWhen it makes sense
    3. CWhenever the product is free of defects
    4. DTo make sure the Development Team is done every Sprint
  8. 8The time-box for a Daily Scrum is?
    1. AThe same time of day every day
    2. BTwo minutes per person
    3. C4 hours
    4. D15 minutes
    5. E15 minutes for a week sprint. For shorter Sprints it is usually shorter.
  9. 9Which phrase best describes a Product Owner?
    1. ARequirements engineer
    2. BValue optimizer
    3. CTeam manager
    4. DGo-between development team and customers
  10. 10Which answer best describes the topics covered in Sprint Planning?
    1. AWhat can be done and how to do it
    2. BWho is on the team and what team member roles will be
    3. CWhat to do and who will do it
    4. DHow conditions have changed and how the Product Backlog should evolve
    5. EWhat went wrong in the last Sprint and what to do differently this Sprint

Informationen

Beschreibung
Quiz am Scrum Test , erstellt von Alban Couturier am 21/04/2017.
Sprache
English
Aufrufe
9
Verlauf
Erstellt am 21 Apr 2017 · aktualisiert am 21 Apr 2017
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck