  1. 1Development Team membership should change:
    1. AAs needed, while taking into account a short term reduction in productivity
    2. BEvery Sprint to promote shared learning
    3. CNever, because it reduces productivity
    4. DJust as it would on any development team, with no special allowance for changes in productivity
  2. 2As Scrum Teams mature, it is expected that the following decision is likely to be taken:
    1. AThe Sprint Retrospective will grow to be longer than 4 hours
    2. BSprint Reviews will no longer be needed.
    3. CThey will improve their definition of 'Done" to include more stringent criteria
    4. DThere is no need for a time-boxed Sprint, since time-boxes are only for new Scrum teams.
    5. EA scrum master is no longer needed since they are a mature team now.
  3. 3If burndown charts are used to visualize progress, what do they track?
    1. Aaccumulates business value delivered to the customer
    2. BAccumulates cost
    3. Cwork remaining across time
    4. DIndividual worker productivity
  4. 4Which phrase best describes a product owner?
    1. ATeam manager
    2. Brequirements engineer
    3. Cvalue optimizer
    4. Dgo-between development team and customers
  5. 5A burndown chart is used to indicate
    1. AThe amount of work remaining across time
    2. BCost incurred by the project
    3. CProductivity of the Development Team
    4. DTemperature of the Sprint Backlog
  6. 6Product Backlog estimates are created by
    1. AAppropriate subject matter experts
    2. BThe product owner
    3. CThe Development Team in collaboration with the Product Owner
    4. DThe Scrum Master
  7. 7A Product Backlog item is complete when
    1. AThe Sprint in which it was selected ends
    2. BWhen corresponding Sprint Backlog items are completed
    3. CWhen all acceptance criteria are met
    4. DWhen it meets the Scrum Team’s definition of ‘done.’
  8. 8Scrum is based on
    1. AStatistical process control
    2. BEmpirical process control
    3. CBest practices from academia
    4. DComplex analysis
  9. 9Why is the Daily Scrum held at the same time and same place?
    1. AThe consistency reduces complexity.
    2. BThe Product Owner demands it.
    3. CThe place can be named.
    4. DRooms are hard to book and this lets it be booked in advance.
  10. 10What is the recommended size for a Team (of developers) within the Scrum Team?
    1. A3 plus or minus 1
    2. B15 plus or minus 3
    3. C 7 plus or minus 2
    4. D9 plus or minus 2

Informationen

Beschreibung
Scrum master certification
Sprache
English
Aufrufe
40
Schlagwörter
psm1
Bewertung
Noch keine Bewertungen
Bewerte dieses Quiz
Bewerte dieses Quiz

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck