GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Karteikarten

AMAC

Jess Ainscough DAIFS Chapter 1 & 2 AAT Englisch 22 Karten

Karten in diesem Stapel (22)

  1. 1Total direct material varianceThe standard cost of materials for the actual production level minus the actual cost of materials for the actual production level
  2. 2Direct material price varianceThe standard cost of the actual quantity of material used minus the actual cost of the actual materials used
  3. 3Direct material usage varianceThe standard quantity of material for the actual production at standard price minus the actual quantity of material used at standard price
  4. 4Total direct labour varianceThe standard cost of labour for actual production minus the actual cost of labour for actual production
  5. 5Direct labour rate varianceThe standard cost of the actual labour hours used minus the actual cost of the actual labour hours used
  6. 6Direct labour efficiency varianceThe standard labour hours for actual production at standard rate minus actual labour hours used at standard rate
  7. 7Direct labour idle time varianceThe actual productive labour hours used at standard rate minus the total actual labour hours used at standard rate
  8. 8Revised direct labour efficiency varianceThe standard labour hours for actual production at standard rate minus actual productive labour hours used at standard rate
  9. 9Standard costingA formal method for predetermining the cost of cost units or products
  10. 10Variance analysisThe comparison of actual costs with standard costs and the calculation of variances which account for differences in the costs
  11. 11Marginal costingThe technique that values cost units based on the variable costs only. Fixed costs are considered to to relate only to the reporting period of time
  12. 12Absorption costingThe technique that values cost units based on a suitable part of all the costs of production, whether fixed or variable in behaviour
  13. 13Ideal standardsA standard set at a level that makes no allowance for losses, and can only be attainable under the most favourable conditions
  14. 14Attainable standardA target or normal standard set at a level that assumes an efficient levels of operation, but includes allowances for normal loss, waste and machined downtime
  15. 15Basic standardA standard set some time ago which can be used to identify trends or develop other standards
  16. 16Tolerance levelThe range around the standard within which performance is considered acceptable and action does not need to be taken
  17. 17Interdependence of variancesThe fact that a single cause may create two or more separate variances
  18. 18Mnemonic for remembering how to calculate direct variancesP-Price variances are based on
    A- Actual quantities, but
    U- Usage variances are based on
    S-Standard Prices
  19. 19Possible causes of material price variance- Poorly set standard
    - Different material supplier
    - Different material quality
    - Different exchange rate
    -High Inflation
    - Unexpected bulk discounts
  20. 20Possible causes of material usage variance- Poorly set standard
    - Different material quality
    - Poor training
    - Higher grade staff
    - Improved production machinery
    - Machine breakdowns
  21. 21Possible causes of labour rate variance- Poorly set standard
    - Higher grade staff
    - Unexpected pay rise
    - High inflation
    - Low bonus payment
  22. 22Possibles causes of labour efficiency variances- Poorly set standard
    - Different material quality
    - Poor training
    - Higher grade staff
    - Improved production machinery
    - Low bonus payments
    - Machine breakdowns

Informationen

Beschreibung
AAT DAIFS Chapter 1 & 2 Karteikarten am AMAC, erstellt von Jess Ainscough am 17/01/2023.
Erstellt von
Jess Ainscough
Aufrufe
18
Bewertung

Mehr zu Material and Labour Variances

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck