- 1What are the 10 Phases of Design and Construction of a Sports Medicine Center?1.Conduct a needs assessment
2. Seek approval for the project
3. Select a construction process model
4. Select an architect
5. Develop schematics
6. Secure the required funding
7. Bid the contraction
8. Analyze bids and take actions
9. Begin construction
10. Monitor construction - 2What is Lump-sum bidding?The most traditional method, is often used for governmental units like public schools and colleges.
- 3What are advantages of Lump-sum bidding?- Results in lowest possible price
-Ensures fairness
-Complies with state and federal statutes - 4What are disadvantages of Lump-sum bidding?-Contractor might underbid
-Less control for owner
-Contractor might cut corners - 5What is construction management approach?The general contractor as part of the design team; That is, the contractor is on board from the beginning of the project, rather than coming in near the end of the design phase.
- 6What are advantages of construction management?-Construction manager is part of design team
-More advice on materials, cost, and schedules - 7What are disadvantaged of construction management?-Construction manger's fee
-No direct control over subcontractors - 8What is design-build?This system only uses one firm to both design and build a sports medicine center.
- 9What are the advantages of using a design-build?-Easier communication
-Ability to fast-track problems - 10What are disadvantages of design-build?-Fewer checks and balances
-Greatest potential for major problems - 11Traffic Patterns are shown in what 2 charts?-Relationship chart
-Bubble diagram - 12What is a relationship chart?Identifying each of the subfunctions of the sports medicine center and to justify the space that they will occupy.
- 13What is a bubble diagram?It illustrates the spatial relationships among the subfunctions of a sports medicine center based on the proximity factors established in the relationship chart.
- 149 elements to consider when creating a facility design1. Location
2. Ergonomics
3. Lighting
4. Flooring
5. Electrical System
6. Plumbing
7. Ventilation
8. Specialized Function Areas
9. Accessibility - 15What are the two most important ventilation concerns?Temperature and
Humidity control - 16How much humility is allowed in a sport medicine facility?Between 40% - 50%
- 17What are foot-candles?A unit of illumination on a surface that is one foot from a point source of one candle
- 18How many foot-candles are recommended to light a Sports Medicine Facility?30 foot-candles by 4 feet
- 19What’s the minimum height requirement for power outlets in the Athletic Training room?3 feet
- 20All electrical outlets in a sports medicine facility should be equipped with a?Ground fault interrupter (GFI): designed to interrupt the flow of electricity if a surge of 5 milliamps or more is detected.
- 21What is a Planning Committee?A group of individuals appointed to work with the architect to develop the design of new buildings.
- 22What is a Capital Campaign?Major institutional response to several needs that the institution intends to remedy over three to five years.
- 23What are Definers?the people who will use the facility.