  1. 1Change control & configuration managementChanges can impact project products.
    Combined these products are known as the project configuration.
  2. 2Impact of changeChanging a specific product may impact others, causing mismatch when connected.
    Uncontrolled change can lead to incorrect versions product specifications in the configuration library.
    Changes can be slowed by configuration management processes causing conflict.
  3. 3What is change freeze?The point in the project when no further changes can be considered.
  4. 4Why Change Freeze?So products can be finished and delivered as currently specified.
    Products can be delivered at various stages of modification or 'release'.
    Changes freezes may require top-level approval.

Informationen

Beschreibung
8.4 explain the relationship between change control and configuration management and the concept of change freeze.
Erstellt von
Althea Green
Aufrufe
8
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck