Jubilee River - Case Study

Description

Flashcards on Jubilee River - Case Study, created by Tom .. on 12/04/2018.
Tom ..
Flashcards by Tom .., updated more than 1 year ago
Tom ..
Created by Tom .. about 6 years ago
105
1

Resource summary

Question Answer
Location Relief channel for River Thames in south-east England
Cost £330 million
Opened 2002
Weirs? 5
Reduces risk Maidenhead, Eton and Windsor
Why was it required Thames flood plain - low Protect Windsor Urbanisation caused flooding High property value Take overflow water
Issues - Social Some places have gained, less wealthy settlements have resulted in a higher flood risk
Issues - Economic Most expensive scheme, but after 1 year, weirs were damaged Small businesses will loose money
Issues - Environmental 2014 flooding downstream - fields were damaged and habitats disturbed Concrete weirs are ugly and algae collected behind them
Show full summary Hide full summary

Similar

Sociology GCSE AQA - Studying Society keywords
tasniask
C2.1 Structure and Bonding
elzzie
The Brain and the Nervous System
feelingthepayne
Physics: Energy resources and energy transfer
katgads
French Chores
Oliver Hall
Animal Farm Chapter Overview
10jgorman
The Nervous System and Hormones (Part 1)
Naomi Science
Economic Growth
Maya Khangura
regular preterite tense conjugation -ar verbs
Pamela Dentler
SFDC App Builder 1 (26-50)
Connie Woolard