CM 434 Lean Construction
  1. LEAN SUPPLY CHAIN MANAGEMENT
    1. Attributes Construction Supply Chain (
      1. Push vs Pull
        1. Push
          1. Materials released on pre-determined schedule
            1. , cost is increased inventory
            2. Pull
              1. Downstream stakeholders
                1. Release triggered by customer(s
                2. Pull w/Bulk Materials
                  1. Kanban
                    1. Customer withdraws from “supermarket
                      1. supermarket then gets replenished by issuing production Kanban; largely visual
                    2. No shop drawings
                      1. Prevents Over Production
                        1. Allows tightly bounded inventory to build up between supplier and customer process
                        2. Material purchased from uniformly produced lots
                          1. → Generally need to have some on-site inventory
                            1. Costs association
                        3. Pull w/ ETO Products
                          1. Requirements
                            1. Lead time
                              1. Look ahead window
                              2. Shop Drawings
                                1. Increase Look Ahead window
                                  1. Easier to perform
                                  2. Reduce Lead time
                            2. Product Types
                              1. Bulk
                                1. MTO
                                  1. ETO
                                  2. Construction Companies generally do not control supply chain
                                    1. Local optimization is limitation of construction
                                      1. Material MGMT Factors
                                        1. space, price, planning (demand) reliability, lead time
                                    2. LEAN DESIGN
                                      1. Pull in Design
                                        1. Target Value Design (TVD)
                                          1. Integrated Design (IDP)
                                            1. Choose-by-advantage (CBA)
                                            2. INTEGRATED PROJECT DELIVERY
                                              1. Attributes
                                                1. Integrate Project Delivery
                                                  1. GMP vs EMP
                                                    1. Contractual Methods for Sharing Pain/Gain
                                                    2. ACTIVITY-BASED COSTING
                                                      1. Two goals of ABC
                                                        1. Mechanisms
                                                          1. Cost Drivers