1Which of the following paint finishes is recommended for hardboard siding?
- AVinyl acetate stain
- BVinyl acrylic paint
- CAcrylic latex paint
- DFlat alkyd
2What benefit is gained by using low-E window glass?
- AIt increases infiltration
- BIt blocks visible light
- CIt stops air leaks
- DIt reduces radiant heat transfer
3The purpose of venting in a roof is to _______.
- AAllow cold air to escape the building to make room for warm air
- BAdd moisture to the warm air rising from the floors below
- CAllow cold air to enter the building
- DAllow heat and moisture to escape the building
4Framing members for a metal truss are connected using _________.
- AWelds and/or self-tapping screws
- BNuts and bolts
- CConstruction adhesive
- DSolder
5To prevent wing-driven rain from being forced back under hand-split wooden shakes, _________.
- AUse underlayment between each course of shakes
- BUse hardboard panels under each course of shakes
- CApply waterproof membrane under the shakes
- DCement each shingle down to the one below it
6The primary advantage of installing wood shingles over open sheathing is ______.
- AEasy access from underneath to seal the gaps between shingles
- BAir can circulate under the shingles to prevent rot
- CEasy shingle replacement
- DAdditional attic ventilation
7If battens are used when applying a tile roof, they are horizontally spaced 1/2" " to 1" " apart to allow ______.
- APortions of the tile roof to be fastened directly to the roof deck
- BFor gaps that will be filled with roofing cement to better hold the tiles
- CFor vertical supports under the tiles
- DAir circulation and drainage under the tiles
8The correct order of applications for a roof installation at an eave is _________.
- ADrip edge flashing, starter strip, underlayment, and finish roof material
- BUnderlayment, starter strip, finish roof material, and drip edge flashing
- CStarter strip, drip edge flashing, underlayment, and finish roof material
- DDrip edge flashing, underlayment, starter strip, and finish roof material
9On an exposed-nail roll roofing installation, the lower edge of the roofing material is fastened to the roof deck by ______.
- ANailing or stapling the material to the roof deck
- BCementing the edge of the material to the layer below it and nailing the material to the roof deck
- CApplying cement to the entire underside of the roofing material
- DCementing the edge of the material to the layer below it
10When using a shingle hatchet, the spacing guide is used to measure the ______.
- AGap between the nails and the top of the shingle
- BGap between shingles
- CAmount that each shingle should overlap the shingle next to it
- DAmount of exposed surface for each shingle
Información
- Descripción
- Test sobre Sin título, creado por megannicole_3 el 15/01/2015.
- Autor
- megannicole_3
- Idioma
- English
- Visitas
- 4
- Valoración
- Aún sin valoraciones Valora este test