1The SAP Going Live Check is split into two sections: Analysis and Verification. What are the recommendations regarding delivery of these sessions?
(More than one answer is correct. Please choose the correct answers.)- AAll sessions should be delivered before the project go-live.
- BAll sessions should be delivered after the project go-live.
- CGoing Live Analysis is conducted at minimum four weeks before the project go-live, during the realisation phase.
- DGoing Live Verification is scheduled after the start of production, during the Go Live Support phase.
- EAll sessions are delivered by certified consultants from SAP Active Global Support through a remote connection.
2Which are the deliverables of the Technical Solution Management work stream in the Realisation phase?
- ADefine General Settings and Master Data.
- BQuality Assurance Environment (QAS).
- CTechnical Solution Design.
- DTechnical Operations and Handover Plan.
- ESAP Going Live Check,
3What is the purpose of the Technical Solution Management work stream in the project preparation phase?
(One answer)- ATo define General Settings and Master Data for the project.
- BTo deliver QA and Production environments and finalize the development of the operations handbook.
- CTo define and develop the Organisational and Production Support Readiness Check
- DTo start preparation of essential technical and infrastructure deliverables that support the initial project planning of an SAP implementation project.
- ETo prepare a strategy to hand off operations of the solution landscape to the post-production support organisation.
4Which are the tasks of the deliverable 'Development Environment (DEV)' in the Blueprint phase?
(More than one answer is correct. Please choose the correct answers.)- AExecute Technical Installation of SAP Products for DEV
- BCreate master data in DEV environment - Master Data #1 - n
- CConduct Design Review Service
- DPerform Manual Configuration in DEV
- EImport Configuration and Development Objects to QAS
5Which transaction code in SAP Solution Manager is used to set up project documentation standards?
(One answer)- ASOLAR01
- BRMMAIN
- CSOLAR02
- DSOLAR_PROJECT_ADMIN
- ESOLAR_LEARNING_MAP
Información
- Descripción
- Diploma ASA380 - ASAP Implementation Methodology Test sobre ASAP 8 Methodology Technical Solution Management Work Stream Quiz , creado por kim.t.dowling el 16/03/2016.
- Autor
- kim.t.dowling
- Idioma
- English
- Visitas
- 50
- Etiquetas
- Valoración
- Aún sin valoraciones Valora este test