¡GoConqr estrena diseño! Cuéntanos qué te parece.

Fichas

Big Gate

Jake U Inglés 10 fichas

Fichas del conjunto (10)

  1. 1Big Gate (word for word) Step 1Safely dismount the apparatus wearing all PPE carrying a radio
  2. 2Step 2Remove the hydrant gate from the rear of the apparatus
  3. 3Step 3Wrap 125mm hose around the hyrdant
  4. 4Step 4Stand on the hose and signal small gate when ready
  5. 5Step 5When the apparatus is stopped or when it is safe to do so, remove steamer cap from hyrdant
  6. 6Step 6Inspect the barrel of the hydrant and connect gate
  7. 7Step 7Ensure that the drain valve is in open position
  8. 8Step 8Radio or signal driver or sector officer that you are ready to turn on the hydrant
  9. 9Step 9Open hydrant when ordered by driver or sector officer, close drain valve
  10. 10Step 10Gather tools, remove kinks in hose, and report to your officer for reassignment

Información

Descripción
Fichas sobre Big Gate, creado por Jake U el 20/09/2015.
Creado por
Jake U · sep 2015
Actualizado
17 ago 2016
Visitas
22
Etiquetas
efrs
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?