Fichas
Acceptance Sampling
Fichas del conjunto (7)
- 1Sampling planA plan that specifies the sample size, the number of samples , and the acceptance sampling.
- 2Double-Sampling PlansA double-sampling plan allows taking a second sample if the results of the initial sample is inconclusive.
- 3Multiple-Sampling PlansA multiple-sampling plan is similar to a double-sampling plan except that more than two samples may be required.
- 4Acceptable quality level (AQL)The percentage of
defects at which a consumer
(buyer) is willing to accept lots
as “good.” - 5lot tolerance percent defective ( LTPD )The percentage just larger than the
upper limit of the percentage
of defectives of a lot that a
consumer is willing to accept. - 6Consumer’s riskThe probability that a bad lot
containing defects equal to the
LTPD will be accepted on the
basis of sample data. - 7Producer’s riskThe probability that a good lot
containing defects equal to the
AQL will be rejected on the
basis of sample data.
Información
- Descripción
- Undergraduate Operation Management Fichas sobre Acceptance Sampling, creado por Hadri Khamis el 08/07/2016.
- Creado por
- Hadri Khamis
- Visitas
- 4
- Etiquetas
- Valoración