Diagrama de flujo
Work Breakdown Structure

Flowchart: Work breakdown structure product development agency Malaysia
Contenido del diagrama
1.0 Open a Product Development Agency in Malaysia
1.1 Establish LufbraSafe
Development Agency Malaysia
1.2 Develop Baby Sterilisation Product
1.1.1 Office
1.1.3 Staffing
1.2.2 Build
1.1.2 Equipment
1.1.1.2 Find available Office Space and enquire
1.1.1.3 Secure Premises
1.1.3.1 Recruit Expatriate Managers
1.1.3.2 Recruit Head of R&D
1.1.3.3 Recruit Research and Development Team
1.2.3 Test
1.2.1.1 Initial Designs
1.2.1.2 Design Development
1.2.1.3 Agree on Final Design
1.2.2.1 Produce Design Brief Document
1.2.2.2 Source Contract Manufacturers
1.2.2.3 Order
1.2.3.2 Ship Prototypes to the UK
1.2.3.2 Test within LufbraSafe UK Facilities
1.1.2.1 Source vendors
1.1.2.2 Specify and Order
1.1.2.3 Receive, Inspect & Accept
1.2.2.4 Receive, Inspect and Accept
1.1.1.1 Research Location
1.2.1 Design