5. PROJECT SCOPE MANAGEMENT

MARILUZ TAYPE ALMONACID Español

Contenido del mapa

5. PROJECT SCOPE MANAGEMENT

  1. 5.1 Plan Scope Management

    • Process of creating a scope management plan that documents how the project and product scope will be defined, validated, and controlled
    • It provides guidance and direction on how scope will be managed throughout the project.
    • Inputs
      • 1 Project charter
      • 2 Project management plan
        • Project life cycle description
          • determines the series of phases that a project passes through from its inception to the end of the project.
        • • Quality management plan
          • can be influenced by how the organization’s quality policy, methodologies, and standards are implemented on the project.
        • • Development approach
          • defines whether waterfall, iterative, adaptive, agile, or a hybrid development approach will be used.
      • 3 Enterprise environmental factors
        • Organization’s culture, Infrastructure, Personnel administration, and Marketplace conditions.
      • 4 Organizational process assets
        • Policies and procedures, Historical information and lessons learned repositories
    • Tools & Techniques
      • 1 Expert judgment
      • 2 Data analysis
        • Alternatives analysis
      • 3 Meetings
        • Include the project manager, the project sponsor, selected project team members, selected stakeholders, anyone with responsibility for any of the scope management processes, and others as needed.
    • Output
      • 1 Scope management plan
        • Describes how the scope will be defined, developed, monitored, controlled, and validated. It´s formal or informal, broadly framed or highly detailed, based on the needs of the project.
      • 2 Requirements management plan
        • Describes how project and product requirements will be analyzed, documented, and managed.
  2. 5.2 Collect Requirements

    • Process of determining, documenting, and managing stakeholder needs and requirements to meet project objectives.
    • It provides the basis for defining the product scope and project scope.
    • Inputs
      • 3 Project documents
        • Assumption Log., Lessons learned register, Stakeholder Register.
      • 4 Business documents
      • 5 Agreements
        • can contain project and product requirements.
      • 2 Project management plan
        • Scope management plan
          • contains information on how the project scope will be defined and developed.
        • Requirements management plan
          • has information on how project requirements will be collected, analyzed, and documented.
        • Stakeholder engagement plan
          • is used to understand stakeholder communication requirements and the level of stakeholder engagement in order
      • 6 Enterprise environmental factors
      • 7 Organizational process assets
      • 1 Project charter
    • Tools & Techniques
      • 2 Data gathering
        • Brainstorming
          • Used to generate and collect multiple ideas related to project and product requirements.
        • Interviews
          • Is a formal or informal approach to elicit information from stakeholders
        • Focus groups
          • Used to learn about their expectations and attitudes about a proposed product, service, or result
        • Questionnaires and surveys
          • Are written sets of questions designed to quickly accumulate information from a large number of respondents
        • Benchmarking
          • Involves comparing actual or planned products, processes, and practices
      • 3 Data analysis
        • Document analysis
      • 4 Decision making
        • Voting
          • Unanimity
            • A decision that is reached whereby everyone agrees
          • Majority
            • Decision that is reached with support obtained from more than 50% of the members of the group
          • Plurality.
            • A decision that is reached whereby the largest block in a group decides, even if a majority is not achieved.
        • Multicriteria decision analysis
        • Autocratic decision making
      • 5 Data representation
        • Affinity diagrams
          • Consolidates ideas created through individual brainstorming sessions into a single map
        • Mind mapping
          • Allow large numbers of ideas to be classified into groups for review and analysis.
      • 6 Interpersonal and team skills
        • Nominal group technique
          • Used to rank the most useful ideas for further brainstorming or for prioritization
        • Observation/conversation
          • Provide a direct way of viewing individuals in their environment and how they perform their jobs or tasks and carry out processes
        • Facilitation
          • Is used to define product requirements.
      • 7 Context diagram
        • Represents the product scope by showing a business system
      • 8 Prototypes
        • Is a method of obtaining early feedback on requirements
    • Outputs
      • 1 Requirements documentation
        • Describes how individual requirements meet the business need for the projec
        • Include: Business requirements, Stakeholder requirements, Solution requirements, Transition and readiness requirements, Project requirements and Quality requirements.
      • 2 Requirements traceability matrix
        • Is a grid that links product requirements from their origin to the deliverables that satisfy them.
        • It´s provides a structure for managing changes to the product scope
  3. 5.3 Define Scope

    • Process of developing a detailed description of the project and product
    • Inputs
      • 3 Project documents
        • Assumption log
          • Identifies assumptions and constraints about the product, project, environment, stakeholders, and other factors
        • Requirements documentation
          • Identifie requirements that will be incorporated into the scope.
        • Risk register
          • Contains response strategies that may affect the project scope
      • 4 Enterprise environmental factors
      • 5 Organizational process assets
      • 1 Project charter
      • 2 Project management plan
        • Scope management Plan
    • Tools & Techniques
      • 1 Expert judgment
      • 2 Data analysis
        • Used to evaluate ways to meet the requirements and the objectives identified in the charter.
      • 3 Decision making
        • Multicriteria decision analysis
      • 4 Interpersonal and team skills
        • • Facilitation
      • 5 Product analysis
        • Used to define products and services
    • Outputs
      • 1 Project scope statement
        • Is the description of the project scope, major deliverables, assumptions, and constraints.
      • 2 Project documents updates
        • Requirements traceability matrix
        • Requirements documentation
        • Assumption log
          • Is updated with additional assumptions or constraints that were identified during this process.
        • Stakeholder register
    • It describes the product, service, or result boundaries and acceptance criteria.
  4. 5.4 Create WBS

    • Process of subdividing project deliverables and project work into smaller, more manageable components
    • It provides a framework of what has to be delivered.
    • Inputs
      • 2 Project documents
        • Project scope statement
          • Describes the work that will be performed and the work that is excluded.
        • Requirements documentation
          • Describe how individual requirements meet the business need for the project.
      • 1 Project Management Plan
        • Scope management plan
      • 3 Enterprise environmental factors
      • 4 Organizational process assets
    • Outputs
      • 1 Scope baseline
        • Is the approved version of a scope statement, WBS, and its associated WBS dictionary
        • Project scope statement
          • Includes the description of the project scope, major deliverables, assumptions, and constraints
        • WBS
          • Is a hierarchical decomposition of the total scope of work to be carried out
        • Work package.
          • The lowest level of the WBS is a work package with a unique identifier
        • Planning package
          • A control account may include one or more planning packages
        • WBS dictionary
          • It provides detailed deliverable, activity, and scheduling information about each component in the WBS.
      • 2 Project documents updates
        • Assumption log
          • Is updated with additional assumptions or constraints that were identified during the Create WBS process.
        • Requirements documentat
          • To include approved changes resulting from the Create WBS process.
    • Tools & Techniques
      • 1 Expert judgment
      • 2 Decomposition
        • Used for dividing and subdividing the project scope and project deliverables into smaller, more manageable parts.
  5. 5.5 Validate Scope

    • Process of formalizing acceptance of the completed project deliverables
    • Inputs
      • .1 Project management plan
        • Inlcude: Scope baseline., Scope management plan, uu Requirements management plan.
      • .2 Project documents
        • Include: Lessons learned register, Requirements documentation, Quality reports, Requirements traceability matrix.
      • .3 Verified deliverables
        • Are project deliverables that are completed and checked for correctness through the Control Quality process.
      • .4 Work performance data
        • include the degree of compliance with requirements, number of nonconformities
    • Tools & Techniques
      • .1 Inspection
      • .2 Decision making
        • Voting
    • Outputs
      • .1 Accepted deliverables
      • .2 Work performance information
        • Includes information about project progress
      • .3 Change requests
        • Are processed for review and disposition through the Perform Integrated Change Control process
      • .4 Project document updates
        • Lessons learned register
          • is updated with information on challenges encountered
        • Requirements documentation
          • may be updated with the actual results of validation activity
        • Requirements traceability matrix
          • Is updated with the results of the validation, including the method used and the outcome
  6. 5.6 Control Scope

    • Process of monitoring the status of the project and product scope and managing changes to the scope baseline.
    • Inputs
      • .1 Project management plan
        • Scope management plan
        • Requirements management plan
        • Change management plan
        • Configuration management plan
        • Scope baseline
        • Performance measurement baseline
      • .2 Project documents
        • Lessons learned register
        • Requirements documentation
        • Requirements traceability matrix
      • .3 Work performance data
        • Include the number of change requests received, requests accepted, and the number of deliverables verified, validated, and completed.
      • .4 Organizational process assets
    • Tools & Techniques
      • .1 Data analysis
        • Variance analysis
          • Is used to compare the baseline to the actual results
        • • Trend analysis
          • Examines project performance over time to determine if performance is improving or deteriorating.
    • Outputs
      • .1 Work performance information
        • includes correlated and contextualized information on how the project and product scope are performing compared to the scope baseline
      • .2 Change requests
      • .3 Project management plan updates
        • Scope management plan
        • Scope baseline
        • Schedule baseline
        • Cost baseline
        • Performance measurement baseline
      • .4 Project documents updates
        • Lessons learned register
        • Requirements documentation
        • Requirements traceability matrix
    • The scope baseline is maintained throughout the project
  7. Product scope

    • features and functions that characterize a product, service, or result
  8. Project scope.

    • work performed to deliver a product, service, or result with the specified features and functions.

Información

Descripción
Mapa Mental sobre 5. PROJECT SCOPE MANAGEMENT, creado por MARILUZ TAYPE ALMONACID el 05/09/2017.