estimates projects

Vince Weir Inglés

Contenido del mapa

estimates projects

  1. estimating projects

    • Estimating
      • types of estimates
        • macro
          • top down
            • consensus methods
            • Ratio method
            • apportion method
            • function point method for software and system projects
        • micro
          • bottom up
    • quality of estimates
      • other factors
      • planning horizon
      • project complexity
      • people
      • project structure & organization
      • padding estimates
      • organization culture
  2. preparing initial estimates

    • use people familiar with the task
    • use several people to make estimates
    • assume normal conditions
    • use consistent time units
    • assume tasks are independent
    • make no allowance for contingencies
    • include a risk assessments
  3. estimates

    • time
    • cost
      • types of cost
        • direct costs
        • direct (projected) overhead costs
        • general & admin overhead costs
    • quality of estimates
      • planning horizon
      • project complexity
      • people
      • project structure & organization
      • padding estimates
      • organization culture
      • other factors
    • preparing initial estimates
      • use people familiar with the task
      • use several people to make estimates
      • assume normal conditiond
      • use consistent time units
      • assume tasks are independent
      • make no allowance for contingencies
      • include a risk assessment
    • refining estimates
      • reasons for adjusting estimates
        • overly optimistic
        • Strategic misrepresentation
        • changes in project scope and plans
        • things go wrong on projects
        • normal conditions do not apply
        • interaction costs are hidden in estimates
  4. types of estimates

    • macro top down
      • consensus methods
      • Ratio methods (parametric)
      • apportion method
      • function point methods for software and system projects
      • learning curves
    • micro bottom up
      • template methods
      • parametric procedures
      • range estimates for the WBS work packages
      • phase estimating a hybrid
  5. preferred approach

    • make rough top down estimates
    • develop the WSB/OSB
    • make bottoms up estimates
    • develop schedules and budgets
    • reconcile difference between top down & bottom up estimates
  6. mega projects

    • white whale
    • often over cost & time estimates

Información

Descripción
Mapa Mental sobre estimates projects, creado por Vince Weir el 30/09/2018.
Creado por
Vince Weir · sep 2018
Actualizado
1 oct 2018
Visitas
0
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?