¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

SAB4#48 Validate Scope

mejorequipo2004 Español

SAB4#48 Validate Scope

Contenido del mapa

SAB4#48 Validate Scope

  1. Project Management Plan

    • Includes scope management plan and the scope baseline . In which formally specified acceptance of the deliverables
  2. Requirements Documents

    • List all project requirements, product
  3. Requirements traceability matrix

    • Link requirements since its inception and through the entire project cycle
  4. Verified deliverables

    • According to the process quality control . Project deliverables were reviewed for correction
  5. Work performance data

    • Compliance Agreement requirements , number and severity of nonconformities
  6. Work performance information

  7. Acepted deliverables

  8. Change request

  9. Project documents updates

  10. techniques of group decision making

    • Once the stakeholders Have INSPECTED the deliverables , they'll need to decides whether or not the deliverables can be accepted.
  11. Inspection

    • Measure, analyze and validate to determine if the work and the results meet the requirements and acceptance criteria for the Project.

Imágenes y archivos del mapa

  • SAB4#48 Validate Scope

Información

Descripción
Mapa Mental sobre SAB4#48 Validate Scope, creado por mejorequipo2004 el 14/02/2015.
Creado por
mejorequipo2004
Visitas
9
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?