SAB7#20_Pre-project conditions

Descripción

Mapa Mental sobre SAB7#20_Pre-project conditions, creado por anahi2306 el 01/08/2015.
anahi2306
Mapa Mental por anahi2306, actualizado hace más de 1 año
anahi2306
Creado por anahi2306 hace más de 8 años
21
1

Resumen del Recurso

SAB7#20_Pre-project conditions
  1. Constraints
    1. Assumptions
      1. Constraints limit the team's options
        1. Boundaries or parameters will the project have to function within
        2. Assumptions that are assumed to be true or reliable
          1. Part or the risk management process
            1. Things we believe but we don't have proof or data
            2. Define project Scope
              1. Those have to be identify and review them for validity during life's project
                1. The Project management plan may need to change
                  Mostrar resumen completo Ocultar resumen completo

                  Similar

                  T9. Enfermedades Inflamatorias
                  Vivi Riquero
                  Sociologia Ambiental
                  Jhair Avella Lopez
                  Santo Tomás de Aquino
                  Camilo D'luyz
                  Diferencias entre el latín culto y el latín vulgar
                  Carlos' Badillo Hdez
                  Recursos de Biología para Selectividad
                  Diego Santos
                  factores de riesgo Físico generalizado
                  Miguel Angel
                  ANATOMIA DE LA PELVIS
                  may RODRIGUEZ
                  GEOGRAFIA
                  ROSA MARIA ARRIAGA
                  2.2 LOS MEDIOS DE TELECOMUNICACIONES I
                  antonio del valle
                  OBLIGACIÓN DE DETENER
                  juanbanogranell
                  Mapas conceptuales
                  Eve Contreras