SAB9#48_Validate_scope (Modified)

Contenido del mapa
SAB9#48_Validate_scope (Modified)
- The Validate Scope process actually involves frequent, planned meetings with the customer or sponsor to gain formal acceptance of deliverables during project monitoring and controlling.
Requirements documentation
- PREGUNTA DE EXAMEN !! Quality Assurance , es asegurar que los documentos esten conforme a los estandares establecidos en base a evidencias , Quien debe ser el QA en el proyecto? el PM o el Sponsor? el Sponsors si tengo un QA pues el QA debe auditar
Traceability matrix
Deliverables
- These are verified deliverables, which means they’ve been through Perform Quality Control.
- These are verified deliverables, which means they’ve been through Perform Quality Control.
Work performance data
- As per the PMBOK Guide, the work performance data is “the raw observations and measurements identified during activities performed to carry out the project work; e.g. actual cost, actual duration, and percent of work physically completed.”
- As per the PMBOK Guide, the work performance data is “the raw observations and measurements identified during activities performed to carry out the project work; e.g. actual cost, actual duration, and percent of work physically completed.”
Group decisionmaking techniques
- Once the stakeholders have inspected the deliverables, they’ll need to decide whether or not the deliverables can be accepted
- This is where the stakeholders actually look closely at the what the team did and make sure that every single piece of work was completed.
Verified deliverables
- If the team did the work right, then the stakeholders will formally accept the deliverables (which means they do it in writing).
Change requests
Project document updates
Work performance information
- As per the PMBOK Guide, the work performance information is “the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas; e.g. status of deliverables, and forecasted estimates to complete, etc.”
- As per the PMBOK Guide, the work performance information is “the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas; e.g. status of deliverables, and forecasted estimates to complete, etc.”
Relationship between validate scope and control quality
The Validate Scope process actually involves frequent, planned meetings with the customer or sponsor to gain formal acceptance of deliverables during project monitoring and controlling.
Imágenes y archivos del mapa
Información
- Descripción
- PMP Taller de Certificación PMI Mapa Mental sobre SAB9#48_Validate_scope (Modified), creado por Roman Velasquez el 20/04/2016.
- Creado por
- Roman Velasquez
- Visitas
- 0
- Historial
-
- Creado por edith.labastida. · 20 abr 2016
- Copiado por Roman Velasquez · 20 abr 2016
- Valoración