Mind map about steps in ABC costing: step 2 and identify a fixed overhead cost

Mind map: Steps in ABC costing

Contenido del mapa

Steps In ABC Costing

  1. 1

    • 2
      • 3
        • 4
          • Determine how many units are made in each incidence of the cost driver .this is likely to vary for each unit
          • 5
            • Work out the Cost that is absorbed by the each unit of the finished product
        • Work out the cost incurred each time the Activity Occurs.
      • Identify the activity that causes the cost .In ABC terminology that activity is the cost driver ,but it might be better to take it as the "COST CAUSER"
    • Identify a fixed overhead cost .

Información

Descripción
Master (A1 :Activity Based Costing) ACCA F5: Performance Management Mapa Mental sobre Steps In ABC Costing, creado por Shahid Musthafa el 13/07/2013.
Creado por
Shahid Musthafa
Visitas
331
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?