  1. FLOODING

    • BANGLADESH
      • 8th July 2004- September
      • multiple cyclones and the Himalayas melting
      • 800,000 ha flooded
    • BOSCASTLE
      • 18th august 2004
      • 600mm of rain in 2 hours
      • £4.6 million worth of repairs
      • hurricane Alex
    • STORM HYDROGRAPH
      • lag time
      • rising limb / falling limb
      • peak rain fall / peak discharge
    • discharge
      • amount or type of rainfall,temprature
      • rock type permeable/inprmeable
      • previous weather conditions
    • causes
      • physical-prolonged rain
      • deforestation
  2. DAMS AND RESOVIORS

    • Kielder water Northumberland
      • £167 million to build
      • took 7 years to build
      • advantages
        • supplies water to NW england
        • brings tourisum to the area
        • looks good
        • £6 million a year
      • disadvantages
        • 7 familes and farming communities were rehomed
        • its never been less than 90% full sop some say its useless
        • 1.5 million trees chopped down
        • flooded a previously existing valley
        • forestry commission employees lost jobs
      • its sustainably managed
        • each year the forestry coummision plant 3.5 million trees to replaced the cut down ones
      • opened in 1982
      • dam
      • has an obsorbortory
  3. landforms

    • WHAT THE HELLS AN OX BOW LAKE
    • waterfall
    • gorges
    • valleys
  4. proceses

    • erosion
      • solution
      • attrition
      • hydrochloric action
      • abrasion
    • deposition
  5. river valleys

    • long profile
      • upper
      • lower
      • middle
    • cross section
  6. managing rivers

    • ENGENERING
      • HARD
        • THREE GORGES DAM
          • IN CHINA $22.6 BILLION TO BULID AND IS IN CHINA
        • leves and channel straightening
      • SOFT
        • forestry programs
        • flood warning scheme
        • do nothing
  7. river tees

    • starts off in a mash where 120ml of water gets stored up
    • middle course wide and deep
    • lower course is industrial
    • just south of Newcastle and east of Middlesbrough

Imágenes y archivos del mapa

  • RIVER PROCESSES AND PRESSURES
  • RIVER PROCESSES AND PRESSURES
  • RIVER PROCESSES AND PRESSURES

Información

Descripción
lad
Creado por
Alex Gray
Visitas
24
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?