¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

P-Signals

Lauren Neuburger Nuclear Operations SRO Inglés

Contenido del mapa

P-Signals

  1. P-4: Reactor Trip

    • Purpose: Protection Grade Signal
    • Setpoint: Reactor Trip Breakers Open
    • Coincidence: Train associated trip breaker and bypass breaker open or not connected.
    • Notes: Performs the following:
      • Activates Main Turbine Trip
      • Will generate FW Isolation signal if Tave below low Tave setpoint of 564 deg F (processed by SSPS)
      • Blocks auto re-actuation of SI after manually resetting SI (processed by SSPS)
      • Seals in FW Isolation signal due to SI or HI-HI S/G level (P-14) (processed by SSPS)
      • Arms Steam Dumps to allow operation in Tave mode from Plant Trip Controller
  2. P-6: SR Rx Trip Block

    • Setpoint: > 10E-10 amps
    • Coincidence: 1/2 IR
    • Notes:
      • Allows manual block of SR Hi Flux Trip (2/2 block switches)
      • Block switches also de-energize SR Hi Volts
      • When <10E-10 amps on 2/2 channels then:
        • SR Hi Volts re-energized
        • SR trip and Flux doubling protection re-instated (occurs automatically)
  3. P-7: At Power

    • Setpoint: None
    • Coincidence: P-10 or P-13 met
    • Notes: The following Rx Trips are re-instated with P-7 met (blocked when not met):
      • PZR Lo Pressure
      • PZR Hi Level
      • RCP Undervoltage
      • RCP Underfrequency
      • Low Flow in 2 RCS Loops
  4. P-8: 3 Loop Flow

    • Setpoint: > 48%
    • Coincidence: 2/4 PR Channels
    • Notes: Allows Rx trip when low flow condition is sensed
      • On 2/3 channels for 1 RCS loop
      • Auto blocked when 2/4 channels < 48%
  5. P-9: Turbine Trip

    • Setpoint: > 50%
    • Coincidence: 2/4 PR Channels
    • Notes: When met, generates RX Trip if Turbine Trip occurs
      • Auto blocked when < 50% on 3/4 PR channels
  6. P-10: Nuclear At Power

    • Setpoint: > 10%
    • Coincidence: 2/4 PR Channels
    • Notes: When met, it performs the following:
      • Feeds P-7
      • Auto blocks SR Trip and de-energizes SR Hi Volts
      • Allows blocking of IR Trip and C-1
      • Allows blocking of PR Trip (Low setpoint)
      • SR Hi Flux at S/D annunciator and CTMT Evacuation alarm defeated
    • Notes: When 3/4 PR channels < 10% the following are auto re-instated:
      • IR Trip
      • C-1
      • PR Trip (Low setpoint)
      • Removes permissive to P-7
  7. P-11: PZR SI Block

    • Setpoint: < 1960 psig
    • Coincidence: 2/3 PZR Pressure Channels
    • Notes: When met allows manual blocking of:
      • Low PZR Pressure SI
      • Low Steamline Pressure SI, once blocked the Neg Steam Line P Hi Rate is armed
    • Notes: Once PZR P > 1960 psig on 2/3 channels then:
      • Low PZR SI blocked, Open signal to SI Accum Isol Valves
      • Low Steamline P armed, Neg SL P Hi Rate blocked, Open signal to SI Accum Isol Valves
  8. P-12: Lo-Lo Tave

    • Setpoint: 553 deg F
    • Coincidence: 2/4 Channels
    • Notes: When met:
      • Auto closes all steam dump valves
      • 3 Cooldown steam dump valves may be opened by bypass switch
  9. P-13: Turbine At Power

    • Setpoint: Turbine PWR > 10% RTP
    • Coincidence: 1/2 Turbine Impulse P Channels
    • Notes: When met:
      • Feeds P-7
      • Auto removes signal to P-7 when no longer met
  10. P-14: S/G Hi-Hi Level

    • Purpose: Protection
    • Setpoint: 84% (U1) / 81.5% (U2)
    • Coincidence: 2/3 detectors on any 1 S/G
    • Notes: When met performs the following:
      • Trips MFPs
      • Trips Main Turbine
      • Generates Main FW Isolation signal

Información

Descripción
Westinghouse Permissive Signals
Visitas
53
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?