Apuntes
CHAPTER 5 - created from Mind Map
Contenido del apunte (1)
Página 1
Types of project constraints
Scheduling Problem
Resource allocation Methods
Technical or Logic Constraints
Resource Constraints
related to the networked sequence in which project activities must occur
absence, shortage, or unique interrelationship and interaction characteristics of resources that require a particular sequencing of project activities
People, Materials, Equipment, Working Capital
Time Constrained Project
Resource Constrained Project
Limiting Assumptions
Time-Constrained Projects
Splitting activities is not allowed
Level of resource cannot be changed
most slack pose the least risk.
Reduction of flexibility does not increase risk.
completed by an imposed date
leveling techniques
Peak resource demands are reduced
Resources over the life of the project are reduced.
Fluctuation in resource demand is minimized.
Información
- Descripción
- Apunte sobre CHAPTER 5 - created from Mind Map, creado por Firdaus Salleh el 08/01/2018.
- Creado por
- Firdaus Salleh · ene 2018
- Actualizado
- 8 ene 2018
- Visitas
- 0
- Historial
-
- Creado por Firdaus Salleh · 8 ene 2018
- Copiado a Apunte por Firdaus Salleh · 8 ene 2018
- Valoración