Screeding Quiz
Crea una cuenta gratis para terminar este test
Guarda tu progreso y consulta tu resultado final.
¿Ya tienes cuenta? Inicia sesión
Preguntas del test (20)
11. How much mixed material is needed to complete a floor screed 5.000 m long by 4.000 m wide
and 0.050 m thick?- A0.25 m3
- B0.5 m3
- C1 m3
- D 1.5 m3
22. Tools and equipment for floor screeding will generally include:
- A sweeping brush, trowel, float, mixer, shovel
- B splash brush, small tool, gauger, trowel, float
- Cspirit level, trowel, buckets, mixer, float
- Dlevelling equipment, trowel, float, shovel buckets, mixer
3Plastic sheeting below the structural floor is the:
- A damp proof membrane
- B vapour barrier
- C moisture trap
- Daid to curing the floor
4The type of cement used in floor screeds is:
- AMasonry Portland
- BExtra Portland
- CRapid Portland
- DOrdinary Portland
5Sands used for floor screeding:
- Ashould contain a high proportion of fine grains
- Bshould contain a high proportion of large grains
- Ccan be any type
- Dshould be sharp and well graded
6Ready-mixed screeds are:
- A prepared off site and delivered as required
- Bprepared after work for the following day
- Cprepared in the morning for use during the day
- Dused only for self-levelling floors
7Screed rails or battens are used to:
- Ahelp delivery of screed material to the workstation
- Bassist in forming the main area of floor
- C tamp down the surface of the screed
- Dform channels for drainage
8The purpose of a damp proof membrane is to:
- Aassist the passage of moisture
- Bassist in the curing process
- Callow the screed to dry out quickly
- Dprevent the passage of moisture
9Cracking of large area floors may be reduced by:
- Ause of more cement
- Buse of expansion strips
- Cadding more sand
- Da self-levelling compound
10Battens used as a guide for screeds may be:
- Aset out from datum lines
- B laid at 50 mm depth
- Cset out from base floor
- Dlaid to form 75 mm depth
11The most accurate proportioning of floor screeding materials:
- A is by weight
- B is important near heavily trafficked areas
- Ccan be carried out using shovels
- Dcan be carried out using buckets
12The correct consistency for floor screeding materials is:
- Aas dry as possible
- Bslurry like
- Csemi wet
- Dsemi dry
13Mixing of screed material:
- A does not have to be thorough as it will be spread by shovel
- B needs to be consistent or wear will take place
- C should be carried out as slowly as possible
- D can take place after water has been added
14Compacting screeds results in a:
- Alightweight screed
- Bquicker set screed
- Cmore dense screed
- Dslower set screed
15Compacting can be carried out with a:
- A screed rail
- Bdatum
- Crule or float
- Dlevel
16High volumes of ventilation:
- A will aid the setting process
- Bwill not affect the screeds after laying
- Cwill allow the cement to harden quickly
- Dmay make the surface of the screed dusty
17The finish on a floor screed:
- A is not important as it will all be covered up
- Bis important as it may show through the final covering
- C can be completed the next day
- D can be completed by the floor layer with the finish
18Laying polythene sheet on the floor screed after laying will:
- Aact as an accelerator to the set
- Bproduce an even surface
- Callow the cement to set naturally
- Dkeep the floor soft for the next process
19The purpose of curing is to:
- Aallow the cement to set and harden over a long period
- Bproduce an even surface
- Cproduce a lightweight screed
- Daid compaction to take place
20Where drainage outlets are fitted:
- A the floor must be laid from this point
- B they can be repositioned later
- Cthe floor can be altered to fit when finish is applied
- D the drainage contractor will alter them to suit
Información
- Descripción
- Test sobre Screeding Quiz, creado por Steve Lockwood el 05/11/2014.
- Autor
- Steve Lockwood
- Idioma
- English
- Visitas
- 448
- Valoración
- Aún sin valoraciones Valora este test