  1. 1[blank_start]Residual Risk[blank_end] is the [blank_start]remaining[blank_end] risk which cannot be defined in more detail after elimination or inclusion of all conceivable quantified risks in a risk consideration. Residual risk is the level of uncontrolled risk remaining after the risk treatment.
    1. Aremaining
    2. Btotal
    3. CResidual Risk
    4. DRisk Acceptance
    5. ERisk Treatment
    6. FRisk Tolerance
  2. 2[blank_start]Risk Acceptance[blank_end] is to make an informed decision to accept the [blank_start]likelihood[blank_end] and [blank_start]impact[blank_end] of a particular risk. Risk Acceptance depends on risk criteria and the risk appetite of Top Management.
    1. Alikelihood
    2. Btotal
    3. Cimpact
    4. Dprobability
    5. ERisk Acceptance
    6. FRisk Treatment
    7. GRisk Tolerance
    8. HResidual Risk
  3. 3[blank_start]Key Planing Scenario (KPS)[blank_end] provides the [blank_start]BC Team[blank_end] with a perspective of the [blank_start]magnitude[blank_end] of disaster that an organization is willing to commit the [blank_start]resources[blank_end] to mitigate and is acceptable to the organisation. This organisation includes the Executive Management, Organization BCM Coordinator, BCP team, DRP team and the Crisis Management Team.
    1. Amagnitude
    2. Blevel
    3. Cresources
    4. Dhuman resources
    5. EBC Team
    6. FBCP Team
    7. GKey Planing Scenario (KPS)
    8. HRisk Appetite
    9. IWorst Case Disaster Scenario
  4. 4A Man-made Threat is an event resulting from [blank_start]human intent[blank_end], negligence, or error. It is divided into into two category: [blank_start]human[blank_end] or [blank_start]technology[blank_end].
    1. Ahuman intent
    2. Bsabotage
    3. Ctechnology
    4. Dfinancial
    5. Ehuman
    6. Fmanagement
  5. 5[blank_start]Natural Threat[blank_end] is a threat resulting from the effect of [blank_start]nature[blank_end] that may cause a disruptive [blank_start]impact[blank_end] to an organization.
    1. Anature
    2. Benvironment
    3. Cimpact
    4. Deffect
    5. ENatural Threat
    6. FTechnology Threat
  6. 6[blank_start]Period of Disruption[blank_end] is the expected [blank_start]residual[blank_end] disruption resulting from each identified threats, taking into consideration existing controls. The period of disruption is an estimated duration during which the organization’s operations are disrupted ([blank_start]operationally[blank_end]), or access to the primary location is denied ([blank_start]infrastructure[blank_end]).
    1. Aresidual
    2. Bexisting
    3. Coperationally
    4. Dintentionally
    5. Einfrastructure
    6. Fpremise
    7. GPeriod of Disruption
    8. HKey Planning Scenario
  7. 7A [blank_start]Threat[blank_end] is an indication or warning of probable man-made or natural situation that can cause [blank_start]disruption[blank_end] to an organization’s operations or services.
    1. AThreat
    2. BDisaster
    3. Cdisruption
    4. Ddisturbance
    5. EHazard
  8. 8The disruption caused by the occurrence of the [blank_start]threat[blank_end]. It can be operational in nature, causing disruption to the [blank_start]functionality[blank_end] of the organization, or infrastructure in nature which will deny access to or usage of the primary [blank_start]location[blank_end].
    1. Afunctionality
    2. Brevenue
    3. Clocation
    4. Dsite
    5. Ethreat
    6. Fdisaster
  9. 9[blank_start]Worst Case Scenario[blank_end] is the worst possible [blank_start]condition[blank_end] or outcome out of the several [blank_start]possibilities[blank_end] in planning for a [blank_start]disaster[blank_end].
    1. Acondition
    2. Bsituation
    3. Cpossibilities
    4. Dalternatives
    5. Edisaster
    6. Fcrisis
    7. GWorst Case Scenario
    8. HKey Planning Scenario
  10. 10[blank_start]Risk Analysis[blank_end] is the process to evaluate and determine the risk rating, which is the product of [blank_start]risk likelihood[blank_end] and [blank_start]risk impact[blank_end].
    1. ARisk Analysis
    2. BRisk Rating
    3. CRisk Assessment
    4. Drisk likelihood
    5. Elikelihood
    6. Frisk impact
    7. Gimpact

Información

Descripción
BCM BOK2
Idioma
English
Visitas
29
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?