¡GoConqr estrena diseño! Cuéntanos qué te parece.

Test

Pega Assessment

anna.buchanan 25 preguntas Actualizado el 23 mar 2017

Hacer el test

Este test tiene tiempo límite, así que se abre en el reproductor de siempre.

Preguntas del test (25)

  1. 1I want to execute Step 5 straight after Step 2 of an Activity, I use a [blank_start]Jump[blank_end] to do this, if I want to make that conditional, I use a [blank_start]When[blank_end] Rule.
    1. AJump
    2. BWhen
  2. 2When would you consider doing a Ruleset Skim?
    1. AAt the beginning of a project
    2. BAfter a major release
    3. CEvery few months
    4. DAll of the above
  3. 3What is the standard use for a Workpool?
    1. ATo group work-objects and store them in a single work table
    2. BFor storing assigned work
    3. CFor controlling assignment rules
    4. DTo keep the logic for when a work object should be persisted
  4. 4It is a common practice to alter a property beginning with pz at runtime.
    1. AVerdadero
    2. BFalso
  5. 5If you want a Data Page for static data, that is the same for each user, you would use the settings, [blank_start]Node[blank_end] level, and a refresh strategy of [blank_start]1Day[blank_end].
    1. ANode
    2. BRequestor
    3. CThread
    4. D10 Minutes
    5. E3 Hours
    6. F1 Day
  6. 6Edit Inputs are best used when there are unallowed characters in a value, and should always be partnered with a meaningful message
    1. AVerdadero
    2. BFalso
  7. 7How do you see the values of local variables in an Activity?
    1. AYou check the clipboard
    2. BYou check the Parameters
    3. CYou set the tracer to include variables, then check them
    4. DYou include them in the UI
  8. 8In Reports, you can use several charts, a company wants to show how many new purchase requests are placed by various departments (engineering, marketing, HR) a [blank_start]Pie[blank_end] Chart would be best.
    1. ABubble
    2. BPie
    3. CGauge
    4. DSpark
  9. 9The business want more control over their process and so you are considering recommended delegated rules, a good option would be a Flow Rule with descriptive labels, as this is a business friendly BPM style rule.
    1. AVerdadero
    2. BFalso
  10. 10Which statement best describes the goal interval for an SLA?
    1. AThe amount of time allowed before the case automatically advances to the next assignment.
    2. BThe amount of time allowed for a user to advance a case to the next stage.
    3. CThe amount of time in which the case or task should be completed.
    4. DThe amount of time in which the case or task must be completed.

Información

Descripción
pega quiz for our consultants
Idioma
English
Visitas
659
Historial
Creado el 13 feb 2016 · actualizado el 23 mar 2017
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?