¡GoConqr estrena diseño! Cuéntanos qué te parece.

Test

Unit 301- Principles of organising, planning and pricing construction work

john.fox@cnwl.ac 8 preguntas 2.066 visitas 4,0 (1 valoración)

Hacer el test

Preguntas del test (8)

  1. 11. Which of the following information is not required for an isometric drawing?
    1. Aa. Location of building
    2. Bb. Room dimensions
    3. Cc. Positions of walls
    4. Dd. Window specifications
  2. 22. Which of the following is a benefit of isometric drawings?
    1. Aa. Provides a pictorial view of the finished product
    2. Bb. Helps the customer understand what the product will look like
    3. Cc. Provides a pictorial view of the design concept
    4. Dd. All of the above
  3. 3Which of the following is not required to produce isometric projection drawings?
    1. Aa. Isometric axis
    2. Bb. Customer details
    3. Cc. Scale
    4. Dd. Object dimensions
  4. 4
    4. Which construction method is used to ensure heat loss is at a minimum?
    1. Aa. Location of insulation
    2. Bb. Selection of workforce
    3. Cc. Following HASAWA 1974
    4. Dd. Location of services
  5. 5What does EPC stand for?
    1. Aa. Energy Presence Critical
    2. Bb. Energy Presence Certificate
    3. Cc. Energy Performance Critical
    4. Dd. Energy Performance Certificate
  6. 6What insulation material is abbreviated to PIR?
    1. Aa. Polyisurate
    2. Bb. Polyisocyanurate
    3. Cc. Polyisocyan
    4. Dd. Polyisorate
  7. 7What insulation material is abbreviated to EP?
    1. Aa. Excellent polystyrene
    2. Bb. Expanding polystyrene
    3. Cc. Energy polystyrene
    4. Dd. Expanded polystyrene
  8. 8Which sustainable product is sourced by FSC?
    1. Aa. Timber
    2. Bb. Bricks
    3. Cc. Stone
    4. Dd. Cement

Información

Descripción
Practice test
Idioma
English
Visitas
2.066
Valoración
4,0 de 5 · 1 valoración
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?