Test
Unit 301- Principles of organising, planning and pricing construction work
Preguntas del test (8)
11. Which of the following information is not required for an isometric drawing?
- Aa. Location of building
- Bb. Room dimensions
- Cc. Positions of walls
- Dd. Window specifications
22. Which of the following is a benefit of isometric drawings?
- Aa. Provides a pictorial view of the finished product
- Bb. Helps the customer understand what the product will look like
- Cc. Provides a pictorial view of the design concept
- Dd. All of the above
3Which of the following is not required to produce isometric projection drawings?
- Aa. Isometric axis
- Bb. Customer details
- Cc. Scale
- Dd. Object dimensions
4
4. Which construction method is used to ensure heat loss is at a minimum?- Aa. Location of insulation
- Bb. Selection of workforce
- Cc. Following HASAWA 1974
- Dd. Location of services
5What does EPC stand for?
- Aa. Energy Presence Critical
- Bb. Energy Presence Certificate
- Cc. Energy Performance Critical
- Dd. Energy Performance Certificate
6What insulation material is abbreviated to PIR?
- Aa. Polyisurate
- Bb. Polyisocyanurate
- Cc. Polyisocyan
- Dd. Polyisorate
7What insulation material is abbreviated to EP?
- Aa. Excellent polystyrene
- Bb. Expanding polystyrene
- Cc. Energy polystyrene
- Dd. Expanded polystyrene
8Which sustainable product is sourced by FSC?
- Aa. Timber
- Bb. Bricks
- Cc. Stone
- Dd. Cement
Información
- Descripción
- Practice test
- Autor
- john.fox@cnwl.ac
- Idioma
- English
- Visitas
- 2.066
- Valoración
- 4,0 de 5 · 1 valoración Valora este test