1In a gravity return system, the boiler should be placed
- Awell below the lowest radiator
- Bwell below the highest radiator
- Cat the same level as the radiators
2The pressure balancing device that prevents the boiler pressure from forcing he water in the boiler into the return line is called a
- AHartford loop
- BPressure equalizer
- CPressure control valve
3When starting up a steam heating boiler it should be filled to:
- A1/2 of a gage glass
- B1/4 of a gage glass
- C3/4 of a gage glass
4If the water level falls too low during operation of a steam heating boiler the operator should
- Ashut the boiler down
- Badd more water immediately
- Clower the flame and add water to bring it up to a safe level
5The Hartford Loop prevents the water in the boiler from
- Adropping below a safe level
- Bcontamination by impurities in the returning condensate
- Cexceeding the highest safe level
6This steam piping arrangement was also one of the first heating system to be developed.
- Aone-pipe gravity return system
- BHartford loop
- Ctwo-pipe gravity steam system with steam traps
7Slow or insufficient heat throughout a building heated by steam can be caused by:
- Atoo low a firing rate
- Bair leaks
- Coversized piping
8The piping and heating units of a steam heating system must be so arranged that:
- Asteam can flow freely to all heating units
- Bthe condensate can flow freely to the heating units
- Cthe air can be kept at the top of the heating units
9Which of the following would you expect to find in a steam heating system?
1. convectors
2. return traps
3. condensate tank
4. cushion tank
A) 1, 2, 3
B)2, 3, 4
C)1, 2, 4
D)1, 3, 4
E) 1, 2, 3, 4- AA
- BB
- CC
- DD
- EE
10Identify from the following list, which systems are a piping arrangements for steam heating systems.
1. Hartford Loop
2. Two-pipe with variable vacuum system
3. One-pipe gravity system
4. Two-pipe return trap system
A) 1, 2, 3, 4
B) 1, 2, 3
C) 2, 3, 4
D) 1, 3, 4
E) 1, 2, 4- AA
- BB
- CC
- DD
- EE
11Slow or insufficient heat in one or more rooms in a steam heated building can be caused by a:
- Afaulty steam trap
- Bfaulty float switch
- Cfaulty heater
Información
- Descripción
- Standard Piping & Equipment for Steam Heating Systems Operation & Maintenance
- Autor
- Ne Bar
- Idioma
- English
- Visitas
- 66
- Etiquetas
- Valoración
- 5,0 de 5 · 1 valoración Valora este test